The current value of the CT primary winding must be equal to or slightly greater than the size of
the mains switch of the installation. Therefore, the CT must be able to measure the maximum
current expected to be consumed by all the loads being compensated.
L1
L2
L3
N
RED
CARGA
3x400 V / 1x230 V - 50 Hz
L1
L2
L3
S1
N
TB1
BATERÍA DE
CONDENSADORES
1S1 1S2
S1
S2
S1
S2
S1
S2
T.I.1
T.I.2
T.I.3
2S1 2S2
3S1 3S2
Figure 11: Installation of external current transformers (CT).
The connection point of the CT for a capacitor bank that compensates an entire installation is
after the mains switch of the installation.
To prevent excessive attenuation of the signal, it is recommended that the minimum secondary
section winding cable size (terminals S1, S2) is at least
2.5 mm
2
.
Figure 12: Current transformer (CT) connection terminals.
Once the cables are installed, disconnect the jumper connecting the 3 S1 and S2 terminals of
20
OPTIM HYB Series
Instruction Manual
Содержание OPTIM HYB Series
Страница 1: ...INSTRUCTION MANUAL M059B01 03 19A Low voltage capacitor bank with static operation OPTIM HYB Series ...
Страница 2: ...2 OPTIM HYB Series Instruction Manual ...
Страница 34: ...10 CE CERTIFICATE 34 OPTIM HYB Series Instruction Manual ...
Страница 35: ...35 Instruction Manual OPTIM HYB Series ...