background image

70

0-D

C

  Q

U

IC

K S

TA

R

T

70

0-D

C

  Q

U

IC

K S

TA

R

T

Power-Down

Power-UP

Verify Area is safe, power and air are applied,  
E-Stops are out and Fence Gates are closed.

1.  At the Electrical Box, turn the

 Electrical Dis-

connect

 to the ON position.

2.  Turn the 

Control Circuit Switch t

o the ON 

position. 

(Approximately 3 minute boot-up) 

3.  Push the 

Start 

button

.

 

All the 6 lights should be illuminated. 

See re-

verse side for the  6-Light Description.

1.  Push the Stop button. 
2.  Turn the Control Circuit Switch to the OFF 

position.

3.  Turn the Electrical Disconnect to the OFF 

position on the Electrical Cabinet.

700-DC  Quick Start rev 1

•  Ensure the proper staple guns are enabled and staples 

are loaded.

•  Adjust the machine for the desired Door Width. 
•  Adjust the Machine for Door Length 
•  Adjust the machine for the Jamb Height.

•  Select the door hand by way of the 

Reset Left

 or 

Reset Right 

switch. (See Step 1)

Mechanical Setup

Before processing the door, set the following  mechanical 
adjustments.  
See the back of this Quick Start for information on these 
setting

s.

Note: 

Some of these settings are options and may not be 

located on your machine.

  

Main Panel Setup

Before processing the door, verify or change the set-
tings at the Main Panel to match your job. 
•  Enable or Disable the Movable and Fixed Sill and 

Head Guns.

•  Set the Staple patterns for Head and Sill Modes.

Start the Process

5.  Ensure the hinge jamb is in the correct position in relation to the head jamb. 

At the 

Head End,

 push both Hand Free Buttons to 

clamp the Header.

6.   Push both Sill Hands Free Buttons.

 (Drops the door to lower position).

7.  Set Sill in place. Push both  Sill Hand Free Buttons

 (Clamps the door.)

8.  Fire Staple Guns.

 Simultaneously press the Fire Guns Button and the Right 

Hand Free Button to fire all enabled staple guns.

9.  Push both Sill Hand Free Buttons 

(Un-Clamp door.)

10.  Pull out the Door.  

Note:

 If changing the hand of the door, repeat Step 1.

Note: 

To

 move back a step

 at any time during the process, 

•  Turn the Sill Sequence Switch to the 

REV

 position.

•  Press both Hands Free buttons to move back a step.
•  Repeat pressing the buttons until the desired step is reached.
•  After the desired step is reached, switch back to the 

FWD 

position.

•  Continue forward from the last step selected.

Step through the process to frame a door by using the button controls 
located at the Head and Sill ends of the machine. 

1.  To

 select the door hand. 

Simultaneously select Reset Right (RH) or 

Reset Left (LH) and the Right Sill Hands Free Button.

2.  Pull in the door;

 verify header is clear so the Stapler Heads can come 

in. Have a little wiggle room.

3.  Push both Sill Hand Free Buttons.. 

(Brings in movable fence staplers.)

4.  Insert 

the 

Jamb

 and 

Header

.

Machine Action

Control Action

Choose Hand

Right Hand Hands Free Reset Right or Reset Left 

Bring in Side Staple Guns

(Sill End) Both Hands Free Buttons

Clamp the Head

(Head End) Both Hands Free buttons

Lower Door

(Sill End) Both Hands Free Buttons

Clamp the Door

(Sill End) Both Hands Free Buttons

Fire Staple Guns

Right Hand Hands Free Fire Button

Unclamp

(Sill End) Both Hands Free Buttons

Sill Insert

Jamb Insert

Header Insert

Check Alignment

OR

OR

View machine videos at:

https://www.youtube.com/user/kvalinc

To view 700-DC specific videos, enter 700-DC 
on the page search line.

Control Sequence Summary

Отзывы: