Make sure the unit can be accessed easily.
The environmental conditions of the location where the unit is installed must not exceed the
limits set forth in the technical features (See
To ensure proper ventilation, the unit must be installed in a vertical position.
In accordance with LVR, once the unit is installed, it must be protected against direct and indi-
rect contacts; therefore, a circuit breaker and earth leakage protection for the capacitor bank
power supply line should be installed.
3.4.-CONNECTION OF THE CAPACITOR BANK TO THE MAINS
Check that the rated voltage of the capacitor bank matches the voltage between
phases of the grid to which it is being connected.
For feeding cables into the capacitor bank cabinet, always use the entry point
enabled for this purpose (See
showing the cable entry point on
OPTIM
HYB 2
models).
If another part of the cabinet is cut out to be used for cable entry, the CIR-
CUTOR manufacturer's guarantee shall be rendered void
.
Do not cut holes in other parts of the cabinet for feeding cables through or for
installing support brackets.
It may produce trimmings that can cause short-circuits.
Figure 8: Cable entry point on the OPTIM HYB 2 model.
17
Instruction Manual
OPTIM HYB Series
Содержание OPTIM HYB Series
Страница 1: ...INSTRUCTION MANUAL M059B01 03 19A Low voltage capacitor bank with static operation OPTIM HYB Series ...
Страница 2: ...2 OPTIM HYB Series Instruction Manual ...
Страница 34: ...10 CE CERTIFICATE 34 OPTIM HYB Series Instruction Manual ...
Страница 35: ...35 Instruction Manual OPTIM HYB Series ...