background image

22

Wallbox eNext Series Installation Manual

Closing

J

C l o s e   t h e   C h a r g e   P o i n t   a s   p e r   t h e   f o l l o w i n g   s t e p s   o f   v e r i f i c a t i o n   a n d   o p e r a t i o n .

1   —   P OW E R   I N P U T

Before proceeding, make sure voltage is present in the terminal blocks. 

For Three-Phase models pay special attention to Neutral Cable.

2   —   CA R E F U L   W I T H   T H E   W I R E S

Before closing the unit, keep in mind that all cables should remain inside.

3   —   C H E C K   T H E   P LU G S

Plugs should be in good condition before starting the unit.

4   —   E L E C T R I CA L   P R OT E C T I O N S

If the unit includes electrical protections, rearm all of them.

5   —   C LO S I N G

Place the sealing washers on the screws and then place both in the Charge Point to close it. 
Do not thight the screws yet.

6   —   C H E C K   T H E   B E AC O N   L I G H T S

All beacon lights should light properly. Here’s the reference:

7   —   O P E R AT I O N

Check that no abnormal noise appears while the unit is charging.

P LU G   S TAT E

A v a i l a b l e

C h a r g i n g

F a u l t

B E AC O N S   C O LO U R

G r e e n

B l u e

R e d

Содержание Wallbox eNext S

Страница 1: ...Installation Manual Wallbox eNext Series ...

Страница 2: ...Wallbox eNext Series Installation Manual ...

Страница 3: ... this manual can be reproduced copied translated or transmitted in any form or by any means without the prior written permission of the original manufacturer Information provided in this manual is intended to be accurate and reliable However the original manufacturer assumes no responsibility for its use or for any infringements upon the rights of third parties at hat may result from its use All o...

Страница 4: ...Wallbox eNext Series Installation Manual ...

Страница 5: ...01 1 So hello 2 Before installation 3 Overview 4 Dimensions 5 Installation 6 Technical Data 7 Need Help Here s your guide to install eNext 02 04 08 10 12 24 26 ...

Страница 6: ...02 Wallbox eNext Series Installation Manual 1 ...

Страница 7: ...isk while the operations are carried out within the unit Unit must be disconnected from any power source during commissioning ATTENTION Indicates that damage to property can occur if appropriate precautions are not taken So hello THE FOLLOWING SYMBOLS ARE USED FOR IMPORTANT SAFETY INFORMATION IN THIS DOCUMENT Complies with IEC 61851 Electric vehicle conductive charging system IEC 61851 1 2017 Comp...

Страница 8: ...s plugged in be sure hands are dry and when possible wear nonconductive gloves protective clothes and shoes with insulated soles If it is safe to do so work with only one hand keeping the other hand at your side or in your pocket away from all conductive material This precaution reduces the likelihood of accidents that result in current passing through the chest cavity Never handle electrical equi...

Страница 9: ...d and qualified personnel should be able to access to low voltage electrical parts inside the unit Check the installation annually by qualified technician Remove from service any item which have a fault that could be dangerous for users broken plugs caps that don t close Use only Circontrol supplied spare parts Do not use this product if the enclosure or the EV connector is broken cracked open or ...

Страница 10: ...t of the installation have to be aligned with the local and national rules The selectivity of the protections has to be guaranteed at all times 2 POWER SUPPLY LINE DIMENSIONING The dimensioning of the input power supply line of the Charge Point must be checked by a qualified electrician Note that several factors such as cable length between distribution board and Charge Point maximum output curren...

Страница 11: ...07 ...

Страница 12: ...08 Wallbox eNext Series Installation Manual 3 What s included Charge Point Installation Manual 2 5 mm Allen wrench Identification label ...

Страница 13: ...09 Overview 1 Beacon lights 2 Cable glands 3 Plugs 4 Wall support holes 5 Closing box holes Plugs may vary depending on the model 1 2 3 5 2 4 4 4 5 ...

Страница 14: ...10 Wallbox eNext Series Installation Manual 4 Dimensions in mm 39 335 315 200 335 ...

Страница 15: ...11 This measurement may vary Dimensions 168 52 5 105 230 52 5 62 5 34 34 62 5 20 39 5 255 20 5 ...

Страница 16: ...installed on a wall This system has been tested on a concrete wall to be securely fixed in such conditions is recommended to use 3 x Inox A2 wall screws DIN 7982 Ø4 8x3 3 x plastic anchors 6x40 or 8x40 If the wall surface has different properties the screws and plastic anchors must be defined by a qualified installer Screw driver Driller Ratchet 2 5mm Allen Ratchet tool can be used to open close t...

Страница 17: ...ntrol accessories When installing the unit some space shall be reserved for usability maintenance and safety reasons The picture below shows the recommended minimum distances Dimensions in mm 300 1100 300 300 If the recommendations are not followed as described Circontrol will reject all responsibility and the warranty will be void ...

Страница 18: ...14 Wallbox eNext Series Installation Manual B Opening Open the Wallbox using an Allen wrench 2 5mm Allen wrench Use the ratchet tool to open close in conditions that hinder access ...

Страница 19: ...15 C Positioning Drill the wall Drill bit M 6 8 Dimensions in mm 1100 255 230 115 ...

Страница 20: ...16 Wallbox eNext Series Installation Manual D Fixing Place the unit on the previous pierced points and fix it with screws ...

Страница 21: ...exceeding 30 mA For AC fault current RCD s protecting that connecting points shall be at least type A RCD s shall disconnect all live conductors DC fault current shall be mesured by a RCD type B or a appropriate equipment that ensures the disconnection of the supply in case of DC fault current above 6 mA MCB s Miniature circuit breaker Standards IEC 60898 1 IEC 60947 2 or IEC 61009 1 MCB s minimun...

Страница 22: ...he Power Supply is Single Phase connect L1 and N L1 L2 L3 N PE Protections Do not forget to connect the ground cable to the ground terminal Make sure all screws are securely tightened at 4 5 Nm Terminal block maximum cross section 10mm2 S Type of cable allowed by the terminal block Copper Cu External electric protections should be placed upstreams as shown below ...

Страница 23: ...manages the remaining current for the EV Charge Point avoiding any tripping on the Main Circuit BeON is connected downstream of the main power switch and upstream of the main loads For further information please refer to the eNext Instruction Manual and Home BeON manual BOR1 BOR4 A B SNAP FERRITE 2S2 2S1 1S2 1S1 Signal cable has to do two loops into the snap ferrite Home BeON is only available on ...

Страница 24: ...wer supply Single phase power supply The detector sends a signal to the Charge Point main PCB which stops the charge transaction by opening the inner relays This error is notified by 6 blinking red lights In order to restart the charge transaction unplug the EV When the beacon lights turn back to green and it is possible to start another charge transaction Three phase power supply The detector sen...

Страница 25: ...move the jumper to use this function BOR1 BOR4 JUMPER DISABLED ENABLED NO JUMPER BOR1 BOR4 Do not remove the jumper if remote control function is not required otherwise the charge transaction process cannot start When the jumper is removed a device outside of the Charge Point should control the charge transaction This device should close the contact START to allow the charge transaction and if the...

Страница 26: ... cables should remain inside 3 CHECK THE PLUGS Plugs should be in good condition before starting the unit 4 ELECTRICAL PROTECTIONS If the unit includes electrical protections rearm all of them 5 CLOSING Place the sealing washers on the screws and then place both in the Charge Point to close it Do not thight the screws yet 6 CHECK THE BEACON LIGHTS All beacon lights should light properly Here s the...

Страница 27: ... sequence shown below As a guideline the recommended assembly torque is 0 8 1Nm 9 OPERATION Check that no abnormal noise appears while the unit is charging 10 PREVENTIVE MAINTENANCE It is recommended to perform one preventive maintenance per year 1 5 2 3 4 ...

Страница 28: ... 200 mm ENVIRONMENTAL CONDITIONS Operating temperature 5ºC to 45ºC Operating temperature with Low Temperature Kit optional 30ºC to 45ºC Storage temperature 40ºC to 60ºC Operating humidity 5 to 95 Non condensing GENERAL DATA Beacon lights Frontal LED bar Wireless communication Bluetooth v4 2 BLE Available connectors Type 2 Socket Type 1 Cable Type 2 Cable IK8 in some components appended to the body...

Страница 29: ...OWER MINIMUM CABLE CROSS SECTION eNext S Type 2 Socket 32A 7 4kW 10mm2 eNext T Type 2 Socket 32A 22kW 10mm2 Some models cannot include intern protections at this point them shall be placed upstream with the same characteristics The national regulations must be taken into account Please check availability with your local supplier This is the minimun cable cross section recommended for the maximum A...

Страница 30: ...26 Wallbox eNext Series Installation Manual 7 ...

Страница 31: ...27 Need help In case of any query or if further information is required please contact our Post Sales Department 34 937 362 940 34 937 362 941 ps support circontrol com circontrol com ...

Страница 32: ...CIRCONTROL WALLBOX ENEXT SERIES INSTALLATION MANUAL A comprehensive guide on how to install and verify your Wallbox eNext V1 6 October edition 2019 CIRCONTROL S A ALL RIGHTS RESERVED R169 ...

Отзывы: