19
•
Once the kit is assembled, it must be placed in the ground. If the Charge Point has
to be installed outside and there is no limitation of depth, is recommended to make
a concrete base.
•
The concrete base shall provide the passage of power cables, it must be done by
corrugated tube placed inside the foundation through the mounting template, as it
can be seen below.
Before fixing the template inside of the concrete basement make
sure front mark must face with the front side of the charger
43,5
16
23,5
Содержание CCS CHA T2C63
Страница 1: ...Installation Manual Raption Series ...
Страница 2: ......
Страница 4: ......
Страница 7: ...03 ...
Страница 17: ...13 ...
Страница 18: ...14 Raption Series Installation Manual 3 A Dimensions Units specified in milimeters ...
Страница 40: ...36 Raption Series Installation Manual Power input connection Connecting cable Raption 100 1 2 3 4 ...
Страница 53: ...49 ...
Страница 54: ...50 Raption Series Installation Manual 6 ...