26
Raption Series Installation Manual
Steps:
4- Hold the sling to the eyebolts, raise the Charge Point up and placed on the final
location.
5- Screw the 4 x M16 nuts with washers on the threaded rods already installed on
the base (on both sides),
replace the isolation top hat seal with the one provided
to assure IP (the tightening torque has to be 3.5 Nm)
, place again the unit cover,
connect the 3G antenna connector, courtesy light connector and the exhaust fan
connector and assembly the decorative front panel.
Note:
do not remove the eyebolts from the Charge Point, leave it under the cover.
Step 4
Step 5
Содержание CCS CHA T2C63
Страница 1: ...Installation Manual Raption Series ...
Страница 2: ......
Страница 4: ......
Страница 7: ...03 ...
Страница 17: ...13 ...
Страница 18: ...14 Raption Series Installation Manual 3 A Dimensions Units specified in milimeters ...
Страница 40: ...36 Raption Series Installation Manual Power input connection Connecting cable Raption 100 1 2 3 4 ...
Страница 53: ...49 ...
Страница 54: ...50 Raption Series Installation Manual 6 ...