10
Raption Series Installation Manual
1 — S U P P LY
All the units pass their correspondent quality test and are properly packaged for
safe transportation ensuring thus their correct operation. The proper transport of
the unit is responsibility of the freight forwarder.
Upon receipt of the Charge Point make a careful inspection to verify that there is no
shipping damage.
Note:
if any damage caused by the forwarder is not indicated in the delivery note
during the receipt of the Charge Point, CIRCONTROL will not be held responsible for
the cost of repair/replacement.
You must find inside of the box, the foundation kit, the decorative front and rear
panels and two cardboard boxes, one of them with the connectors inside and the
other with the rest of material, such as keys, identification cards, installation
manual, etc.
E
Supply and storage
Содержание CCS CHA T2C63
Страница 1: ...Installation Manual Raption Series ...
Страница 2: ......
Страница 4: ......
Страница 7: ...03 ...
Страница 17: ...13 ...
Страница 18: ...14 Raption Series Installation Manual 3 A Dimensions Units specified in milimeters ...
Страница 40: ...36 Raption Series Installation Manual Power input connection Connecting cable Raption 100 1 2 3 4 ...
Страница 53: ...49 ...
Страница 54: ...50 Raption Series Installation Manual 6 ...