- 9 -
PROCEDURE:
PAGE
18)
Clean out melter.
24-26
N
OTE: When leaving reheatable material in tank, allow the agitator to run until the oil
and material temperatures are the same.
19)
Turn the temperature control box off and shut off engine.
15
20)
Turn LP bottle(s) off.
13
21)
Coil sealing hose and place in cabinets along with wand (Non-heated
hose models only).
22)
Lock hose boom in tow position.
23)
Always secure sealing wand, sealing hose and hose boom
before towing the melter.
Operating Sequence (LP Units cont.)
Содержание 105
Страница 43: ... 43 Hydraulic Schematic B2 A2 A1 B1 MD1 MD2 G2 R2 CS1 093 1500PSI R1 P T Model 105 1100 PSI Model 225 800 PSI ...
Страница 49: ... 49 Wiring Diagrams Complete Wiring Diagram No Heated Hose OilThermocouple Material Thermocouple ...
Страница 67: ... 67 6 11 12 1 7 10 5 3 4 2 13 9 Miscellaneous Parts ...
Страница 70: ... 70 Notes ...
Страница 72: ...2601 Niagara Lane Plymouth MN 55447 763 557 1982 800 328 3874 Fax 763 557 1971 ...