English
English
Machines connected to the main water supply
“ Before using the machine make sure that:
the main electricity supply ON/OFF switch is ON;
the main water supply tap is open. ”
Switch on the mains switch (
4
). Led “machine on” (
18
) will light up.
If the water level in the tank is below the minimum level, the “tank
level” indicator light (
11
) lights up, the tank is automatically topped up
to the optimal level, and the indicator light (
11
) switches off.
At the end of this operation, the water level in the boiler is checked.
If the level is below the minimum, the “boiler level” indicator light (
12
)
lights up, and the boiler is filled up to the optimal level (indicator light
12
off).
“
Heating
” now begins.
Machines not connected to the main water supply
“ Before using the machine make sure that:
the main electricity supply ON/OFF switch is ON;
the water in the tank is at the maximum level. ”
Switch on the mains switch (
4
). Led “machine on” (
18
) will light up.
If the water level in the tank is below the minimum level, the “tank
level” indicator light (
11
) lights up, and the tank should be filled up to
the optimal level using a jug. On completion, the indicator light (
11
)
switches off.
At the end of this operation, the level of the water in the boiler is checked.
If the level is below the minimum, the “boiler level” indicator light (
12
)
lights up, and the boiler is filled up to the optimal level (indicator light
12
off).
“
Heating
” now begins.
Turn the main ON/OFF switch (
4
) to position 1. The “machine ON”
indicator light (
18
) lights up.
If the water level in the boiler is below the minimum level, the “boiler
level” indicator light (
12
) lights up, and the boiler is filled up to the
optimal level (indicator light
12
off).
Turn the main ON/OFF switch (
4
) to position 2.
“
Heating
” now begins.
At the end of the day, turn the machine OFF by turning the main ON/OFF switch (
4
) to position 0.
!
!
“
Don’t light the gas when the boiler is at working
pressure
. ”
Before using the machine check that:
- the main electricity supply ON/OFF switch is ON;
- the main water supply tap is open;
- the gas supply tap is open.
Turn the main ON/OFF switch (
4
) to position 1.
The operations described under “
Daily Switch-On
” are completed.
Press and turn the gas lighter knob (
27
) to position “B”, and keep it
pressed for about 30 seconds.
Check through the observation window (
28
) that the burner is lit, and
then release knob (
27
).
“
Heating
” now begins.
!
27
B
Gas lighting (2 dispenser unit + GAS machines only)
Setting at work - 1 dispenser unit machines
Setting at work - 2 dispenser unit machines
Heating phase
At the end of the working day, switch off the mains switch (
4
).
“ Before using the machine make sure that:
the main electricity supply ON/OFF switch is ON;
the main water supply tap is open. ”
!
During heating, if one of the coffee dispensing push buttons (
13
,
14
,
15
,
16
or
21
) is pressed, the machine dispenses a coffee at the tem-
perature reached at the time.
The same applies when the milk (
9
), cappuccino (
10
) and steam (
20
)
dispensing push buttons are pressed.
The hot water dispensing push button (
19
) is deactivated until the working
pressure is reached.
Heating is completed when the “machine at working temperature” indi-
cator light (
17
) lights up (
for machines with 1 dispenser unit only
)
and the boiler gauge indicator (
3
) remains stable in the green area.
The machine is now ready to dispense coffee, milk, cappuccino, steam
and hot water.
To make sure the dispenser unit and the filter holder (
7
) are at similar
temperatures, turn press the START-STOP push button (
21
) and let
the machine dispense for a few seconds. Then press the push button
(
21
) again.