
OPERATOR MANUAL
4. Installation
21
4.2
Positioning the machine
Install the machine on a surface of at least 0.6 m of height.
Check that the place where the machine is installed meets the environmental requirements previously
specified.
Leave at least 0.3 m distance between each side of the machine and the closest walls in order to
guarantee better access to the connectors and allow suitable air circulation.
A clearance of 0.4 m above the covers is necessary to be able to open them.
Make sure that the surface on which the machine is placed does not amplify the noise level above the
allowed value and that it is sufficiently strong and solid to stand the weight of the machine (31 Kg).
Do not run the machine in vertical position.
4.3
Removing mechanical locks and installing accessories
After placing the embosser in horizontal position and having respected all safety requirements (chapter
OPERATING PRECAUTIONS AND SAFETY REGULATIONS) and before setting up the electrical connection it
is necessary to remove the retainer pin that locks the clamp.
The machine does not operate when the pin is placed in.
WARNING:
THE EMBOSSER WEIGHS ABOUT 30 Kg. HANDLE WITH CARE AND
CAUTION
WARNING:
USE ONLY POWER CABLES NOT LONGER THAN 4.6 M, TYPE SVT OR SJT,
3X18 AWG 10 A, EQUIPPED WITH GROUND CABLE
.
WARNING:
DO NOT PERFORM ANY JOB BEFORE CAREFULLY READING THE WHOLE
OPERATOR'S MANUAL.
Содержание ME550
Страница 1: ...OPERATOR MANUAL EN ME550 DOG TAG MO ME550DT EN R4 ...
Страница 18: ...OPERATOR MANUAL 2 General information 14 ...
Страница 43: ...OPERATOR MANUAL 5 Human Machine Interface 39 ...