background image

Disconnect 

the electrical connectors on the control and disconnect switch.

4  You can now separate the blocks.
Note: Follow the procedure in reverse to re-couple the blocks, particularly for the RHE Z10000 & 15000.

When uncoupling the blocks, ensure that the 18X10 PVC gasket located between the blocks remains correctly 

in place to guarantee a perfect seal. If necessary, fit one.

NB

: if there is a roof, remove it first in accordance with the instructions given on the roof fitting plan (see technical specifications).

FLOWAY “Classic PHE”, “Classic RHE/RHE-Z” and “Vertical PHE” models

These models are placed directly on a flat, smooth floor. The flatness value must be the best possible, around one per thousand. 

Under normal conditions of use, there is no need to fix the unit to the floor.
The unit's support feet must be standing fully on their contact surface. It is important to allow sufficient service space to facilitate 

maintenance operations.

3 - HANDLING

FLOWAY EN-6 

Содержание AQUACIAT POWER IL CLASSIC PHE

Страница 1: ...AQUACIAT POWER ILD CLASSIC RHE RHE Z PHE VERTICALE PHE 11 2020 EN7565702 01 Instruction manual...

Страница 2: ...RHEZ 10000 15000 PROCEDURE FOR ROOF ASSEMBLY 18 5 3 FLOWAY CLASSIC RHEZ VERIFICATION OF PRESSURES 31 5 4 MAINTENANCE SPACE IN FRONT OF THE UNITS 32 6 SYSTEM START UP 32 7 MAINTENANCE SERVICE INTERVALS...

Страница 3: ...he electrical components It is particularly recommended that all the electrical supplies to the unit are switched off before any work is carried out Cut the main power supply using the disconnect swit...

Страница 4: ...t be specified on the delivery note in the presence of the driver before signing the delivery note These comments must be confirmed to the carrier by registered letter within 3 business days The comme...

Страница 5: ...in the support feet Ensure that the crane hook adapter is large enough to prevent the belts applying any pressure to the AHU casing Furthermore ensure that the steel tubes are secured to prevent any...

Страница 6: ...if there is a roof remove it first in accordance with the instructions given on the roof fitting plan see technical specifications FLOWAY Classic PHE Classic RHE RHE Z and Vertical PHE models These mo...

Страница 7: ...ERVICE R f Produit Item Ref An Year N Serie Serial Nbr ELEC ELEMENT P ABSORBEE INPUT BATTERIE HEAT REGIME D signation Description Composant Composant BATTERIE FRD REGIME FLUIDE FLUID N D claration CE...

Страница 8: ...920 763 302 1065 15000 2340 1822 1200 2192 913 444 1357 Floway Classic PHE Size Dimensions mm Weight of Unit 1 kg 10 Weight of Unit 2 kg 10 Total weight 10 kg Height Length Width 1000 958 1580 810 200...

Страница 9: ...tric box 3 Power electric box 4 Filter 5 Rotary heat exchanger 6 FLOWAY Control display 7 Internal coil valve mounting 8 Mixing option damper servomotor 9 Purge sector on the wheel 10 Pressure connect...

Страница 10: ...casing 5 Electrics box control and power 6 Damper 7 Filters Vertical FLOWAY PHE 1 Fan motor assemblies 2 Plate heat exchanger 3 Filters 4 Power and controller electric box 5 Condensate drain 6 Condens...

Страница 11: ...al flow rate m h Maximum flow rate m h Maximum flow rate without cooling coil m h 1000 300 1000 1200 1450 2000 500 2000 2500 2800 3000 700 3000 3700 4500 4000 900 4500 5700 5700 5000 900 5000 5700 700...

Страница 12: ...available on Classic PHE Classic RHE RHE Z and Vertical PHE models Fan motor assembly EC motor This fan motor assembly is a direct coupling type plug fan with rotation speed adjustment via the portab...

Страница 13: ...2x 1 6 Heat recovery unit Counter Flow plate heat recovery unit for Ceiling mounted PHE and Vertical PHE model equipped with a condensate drain pan a motorised by pass and controlled by the Floway Co...

Страница 14: ...sensor The CO2 sensor must be positioned on the return air duct so that it can measure the CO2 level emitted from the part s treated This sensor is supplied as a spare part and the manual for this is...

Страница 15: ...etween 0 5 and 1 5 see control manual Constant pressure on both flow rates each fan is controlled independently according to the pressure of the associated duct network The intake and exhaust flow rat...

Страница 16: ...he hydraulic pipe insulation Technical characteristics Min WINTER temp 28 C Min SUMMER temp 18 C Breaking capacity 5 3 A Cable length 2500 mm 29 1 2 or 7 8 21 BLACK wire winter IVORY wire shared BLUE...

Страница 17: ...Ensure all electrical components are earthed 5 1 OUTDOOR INSTALLATION Classic PHE and Classic RHE RHE Z model only The installation of a Floway dual flow unit outdoors requires a roof and a canopy to...

Страница 18: ...for assembling the roof 1 Remove the roof from the Wheel block retaining the screw and cap 2 Assemble the blocks 3 Reposition the roof from the Wheel Block taking care to ensure the roofs interleave...

Страница 19: ...Removal of the WHEEL Block roof Refitting of the WHEEL Block roof 5 INSTALLATION AND INSTALLATION CONNECTIONS EN 19 FLOWAY...

Страница 20: ...Assembly of the two Blocks with their roofs 5 INSTALLATION AND INSTALLATION CONNECTIONS FLOWAY EN 20...

Страница 21: ...vet Canopy without damper Canopy with damper Screen Screen 11 20 20 11 N x E A D M x F 6 Screen Classic RHE RHEZ A B C C2 D N x E M x F Weight kg 1000 687 274 329 5 311 650 2X135 2 5 2000 787 304 429...

Страница 22: ...the sleeve checking to ensure the holes are aligned 2 Assemble the strips together first identifying the two lengthways strips and the two widthways strips Fit them together and strike in turn to seat...

Страница 23: ...ir discharge 315 355 400 Internal dimensions Additional box Sizes 1 2 3 4 5 Connections mm Inlet air 201x502 301x601 458x984 608x1284 758x1584 Air discharge 201x502 301x601 458x984 608x1284 758x1584 I...

Страница 24: ...118 4 Minimum power supply cable section with electric heater 2 5 mm 2 5 mm 2 5 mm 4 mm 6 mm 6 mm 10 mm 25 mm 35 mm Disconnect switch size OT40 40 A OT40 40 A OT40 40 A OT63 63 A OT63 63 A OT63 63 A...

Страница 25: ...75 to 10 1 5 to 35 Torque Value N m 0 8 2 Connect the unit s electrics to the power network as per the table above Connection to the machine s general disconnect switch located inside it 22 2 blankin...

Страница 26: ...ngeover thermostat Pump 2 monitoring Pump 1 control Pump 2 control Electric heater stage 1 control Intake air duct temperature sensor Pump 1 monitoring Danger fault feedback shared fault feedback main...

Страница 27: ...there is a pre heating coil Pre heating 1 stage post heating 1 stage 4 6 wires Machine terminal block Additional box terminal block Pre heating Additional box terminal block Post heating Notes Inlet O...

Страница 28: ..._ b 10 24 V valve supply Xm 20 _ b 4 Xm 7 _ b 11 Xm 20 _ b 7 Xm 7 _ b 6 Intake air duct temperature sensor NTC10k Analogue input Xm 20 _ b 8 Xm 7 _ b 7 Hydraulic 2 5 wires Machine terminal block Addit...

Страница 29: ...t normally closed AHU operating feedback Machine terminal block Notes Inlet Outlet Xm 18 _ b 1 AHU operating feedback Dry contact Digital output Xm 18 _ b 2 Pump 1 monitoring 4 wires Machine terminal...

Страница 30: ...nger fault monitoring Dry contact shared b 4 Digital outputs Xm 18 _ b 4 Shared Xm 18 _ b 5 Maintenance fault monitoring Dry contact shared b 4 Intake duct pressure sensor 3 wires Machine terminal blo...

Страница 31: ...Verification of the pressures for EATR limitation The limitation of the EATR value depends on the size of the installation and specifically the pressure drop on the exhaust air duct The presence of a...

Страница 32: ...trained in air handling technology Keep all inspection doors closed while the unit is operating Once the electrical and hydraulic connections have been finished the commissioning of the unit can proc...

Страница 33: ...d Maintenance intervals The filter life depends essentially on the amount of dust in the air and the efficiency of the filtration system The filtration quality cannot be maintained if the filter mediu...

Страница 34: ...on abrasive detergents The heat recovery unit on the Vertical PHE model is accessible via the door and can be removed by the sliding runner Rotary heat exchangers Classic RHE RHE Z model Check the max...

Страница 35: ...Check the connections Operating check Retighten the electrical connections Check the components Operating check Pressure temperature sensor Check correct operation and setpoint adjustment Check corre...

Страница 36: ...Manufacturer CIAT S A Culoz France Printed in the European Union Manufacturer reserves the right to change any product specifications without notice...

Отзывы: