background image

チコーエアーテック株式会社 

CMN-070-002

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 

Original instructions 

集塵機 

Dust Collector 

~はじめに  Note To  Users~ 

このたびは、

 

CBA シリーズをお買い上げ頂き、誠にありがとうございます。 

チコーエアーテック㈱は「風の技術」を有効に利用し、コンパクトに空気をクリ-ンにすることをテ-マとして努力しております。 

CBA シリーズは,この風の技術をコンパクトにまとめた省エネ形のクリ-ンBOXです。 

長期間故障なく安全にご使用いただくために、この取扱説明書をよくお読みいただき,本機の性能を十分に発揮できますよう

正しいお取扱いをお願いします。

 

We greatly appreciate that you have purchased our CBA Series. 

CHIKO AIRTEC CO., LTD. is working to achieve clean air with compact equipment while utilizing 

“air technology” 

effectively. 

The CBA Series is an energy-saving-type clean box that realizes 

“air technology” in a compact body. 

Please read this instruction manual thoroughly and handle this CBA Series machine correctly so that you can use it 

safely for a long time and enjoy its full performance.

 

本書中のマークについて 

  Symbols used in this manual 

 
 

警告 

 

WARNING

 

絶対に行ってはいけないこと。及び、取り扱いを誤ると重大事故につながる内容を示し
ています。 

This symbol indicates actions that should not be performed in any case, or actions that 
may lead to a serious accident caused by incorrect handling.

 

 
 

注意 

 

CAUTION 

正しく安全にご使用頂くための注意事項。及び、取り扱いを誤ると、故障の原因になる
内容を示しています。

 

This symbol indicates cautions to assure safe use, and actions that may lead to failure 
caused by incorrect handling.

 

取扱説明書 

Instruction Manual

 

型式  MODELS 

 

CBA-1300AT2 

 

 

(100-115V) 

 

CBA-1300AT2-T   

 

(200V) 

 

CBA-1300AT2(220V)          (220-240V) 

Содержание CBA-1300AT2

Страница 1: ...d this instruction manual thoroughly and handle this CBA Series machine correctly so that you can use it safely for a long time and enjoy its full performance Symbols used in this manual WARNING This...

Страница 2: ...osene paint etc Explosive dust Aluminum magnesium titanium zinc epoxy etc Dust containing sparks Dust containing sparks generated by high speed cutters grinders welding machines etc Fire sources Cigar...

Страница 3: ...8 4 2 AT AT panel 8 4 3 Remote connector 9 4 4 Confirmation before operation 10 4 5 Operation procedure 10 5 Remote Cable Sold Separately 11 5 1 Electrical circuit diagram 11 5 2 Color and signal of e...

Страница 4: ...t outdoors 0 40 80 Install the product in a place without dew condensation at room temperature ambient temperature 0 to 40 C humidity 80 or less High temperature and dew condensation may cause electri...

Страница 5: ...ternal inspection and repair 1 6 Disposal Dispose of the product properly as industrial wast 2 Confirmation and Preparation at Arrival After unpacking make sure that all parts are provided Contact our...

Страница 6: ...xhaust port AT AT Panel operation panel MAIN POWER switch BOX Fuse Box Remote connector MT 173 8 Remote cable option The remote cable is so designed as to be prevented from falling off Insert it secur...

Страница 7: ...ion flange Detachable flange If th flange diameter needs to be changed to match usage conditions the installed flange can be changed without having to use any tools Replacement flanges are sold separa...

Страница 8: ...4 2 AT AT panel Operating the product with a different power supply may cause a failure 3 ON OFF 30 ON OFF Allow an interval of at least three minutes before turning the equipment ON or OFF If the equ...

Страница 9: ...r decreases due to a factor such as an open front door a clogged exhaust filter or a blocked exhaust duct The lamp turns off when the cause of the problem is corrected Insufficient Airflow Red LED Ale...

Страница 10: ...en it is over 4 0 kPa lower it under 4 0 kPa by adjusting the suction hose Using the suction hose which is too thin and is clogged may cause failure by the load too much Confirm that abnormal sounds s...

Страница 11: ...Temperature correction is not provided Reference example 3 5 6 33 0 1 F Attach a noise limiter Approximately 33 0 1 F to the output terminals Nos 1 2 and 3 When adding inductors such as relays 1 2 3 5...

Страница 12: ...operation The AT panel is disabled while the wires 4 and 8 are short circuited Yellow Change capacity level 0 5 The capacity level can be changed by applying a voltage of 0 to 5V between pins 7 and 8...

Страница 13: ...wire AT ON Lo Hi To change the capacity level using the buttons on the main unit when switching to remote operation check that pin is not shorted circuited then press and hold the ON button on the AT...

Страница 14: ...filter grid frame should be located on the exhaust side Make sure to turn OFF the main power and disconnect the power plug from the electrical outlet to cut off the electricity before starting inspec...

Страница 15: ...s into the clearance on the left and right sides between the filter case and the filter to remove the filter easily Remove the primary filter from the filter case The paper packing of the primary filt...

Страница 16: ...ion level correct Filter installation status Once month Are the filters installed securely Filter clogged status Suction force check During operation Does the suction hose end offer proper suction for...

Страница 17: ...ing 1 to 3 above remove the cause of error and press the RESET switch Or turn OFF and ON the MAIN POWER switch to reset the error status Start the operation 30 minutes later Fuses are blown out 6 5 Re...

Страница 18: ...Copyright CHIKO AIRTEC CO LTD 2009 18 8 Electrical Circuit Diagram...

Страница 19: ...onths CBA 1300AT2 FB 30 CHF 3030 50 HEP 3030 69 Note The life above varies depending on the use frequency and suction density Note The contents of this manual are subject to change without prior notic...

Страница 20: ...emo about purchase Model Manufacturer s serial number Date of purchase Start of operation Your name Address Phone Person in charge LTD 562 0012 2 27 24 2 27 24 Hakushima Minoh City Osaka apan 562 0012...

Отзывы: