Installation Instructions
WM210-220-230-240S/SI
25
Figure 67
Lateral Shift Adjustment
IMPORTANT ! :
The mount covers need to be removed
before proceeding with lateral shift adjustment.
NOTE:
Remove mount covers from the mount following
instructions in
Removing Mount Covers
section.
1.
Loosen two 1/4-20 x 5/8" hex head cap screws (E) on
underside of mounting bracket. (See Figure 68)
2.
Adjust projector arm laterally to desired position. (See
Figure 68)
3.
Tighten two 1/4-20 x 5/8" hex head cap screws (E)
loosened in Step 1. (See Figure 68)
Figure 68
4.
Return outer covers to the mount following instructions in
Installing Mount Covers
section.
Security Screw Installation (Optional)
Wall Bracket Covers
1.
Remove eight #8-32 x 1/2" Phillips pan machine screws (F)
from wall bracket covers. (See Figure 69)
Figure 69
2.
Install eight #8-32 x 1/2" button head security screws (V)
into holes in wall bracket covers. (See Figure )
Figure 70
(bottom view)
1
3
2
1
3
2
2
(E) x 2
1
(F) x 8
(Projector arm not shown
for display purposes)
2
(V) x 8
(Projector arm not shown
for display purposes)