WM210-220-230-240S/SI
Installation Instructions
18
Lateral Shift Adjustment
IMPORTANT ! :
The mount covers need to be removed
before proceeding with lateral shift adjustment.
NOTE:
Remove mount covers from the mount following
instructions in
Removing Mount Covers
section.
1.
Loosen two 1/4-20 x 5/8" hex head cap screws (E) on
underside of mounting bracket. (See Figure 40)
2.
Adjust projector arm laterally to desired position. (See
Figure 40)
3.
Tighten two 1/4-20 x 5/8" hex head cap screws (E)
loosened in Step 1. (See Figure 40)
Figure 40
4.
Return outer covers to the mount following instructions in
Installing Mount Covers
section.
Security Screw Installation (Optional)
Wall Bracket Covers
1.
Remove eight #8-32 x 1/2" Phillips pan machine screws (F)
from wall bracket covers. (See Figure 41)
Figure 41
2.
Install eight #8-32 x 1/2" button head security screws (V)
into holes in wall bracket covers. (See Figure 42)
Figure 42
Mount Covers
1.
Remove two 8-32 x 3/8" Phillips pan head screws (AB) from
upper cover. (See Figure 43)
2.
Raise and remove the upper cover from the mount. (See
Figure 43)
Figure 43
1
3
2
2
(E) x 2
1
(F) x 8
(Projector arm not shown
for display purposes)
2
(V) x 8
(Projector arm not shown
for display purposes)
1
(AB) x 2
Upper
cover
2