Installation Instructions
TIL1X2UU / TIL1X3UU / TIL1X4UU / TILVABUU
13
5.
Drill pilot holes towards top and in centerline of upper
mounting slots on second mount (see Table 1 for size) and
follow fastener information (appropriate for wall type) located
in Table 1. (See Figure 15)
Figure 15
6.
Hang second wall mount, aligning upper mounting slots
over fasteners, and adjust side-to-side for proper location.
7.
Slide the left (H) and right adjustment washers (J) into place
behind the partially installed lag screws.
8.
Loosen the side connector screws, upper and lower, prior to
adjusting the mount height. (See Figure 16)
9.
Place a level across front of the mount at bottom of teardrop
slots and check that mounts are level and in line with each
other. (See Figure 16)
10. If mount needs to be raised: use the adjustment washers to
raise the second mount.
11. Re-tighten connector screws, upper and lower. (See
Figure 16)
12. Drill lower pilot holes at the center both vertically and
horizontally within lower mounting slots and use same
fasteners used at top of mount.
13. Continue installation of mounts in this manner until the row
is complete.
Just a tip -
The plumb on these mounts at this
point doesn’t have to be perfect. Final adjustments
can be done once all the mounts are installed.
Checking and adjusting plumb at this point
ensures the mounts are closely aligned on the
same plane to prevent the mount from twisting or
bending when the lag screws are installed.
5
x 2
Just a tip -
The lag screws need to be at the
top of the mounting slot to allow the mount to be
raised slightly, if needed, to align it with the
previously installed mount.
Figure 16
8
Connector screws
9
11
Level