LBM Series
Installation Instructions
16
6.
Starting from the bottom and working up, hang interface
brackets (Y and Z) to display rails (K or L). (See Figure 14)
7.
Use 1/4-20 x 1 1/4" socket head cap screws (I) to secure
interface brackets (Y and Z) to rails for each display. Screws
must engage through both holes to be fully secured. (See
Figure 14)
NOTE:
Display positions may need to be adjusted after height
and/or plumb adjustments in order to maintain desired
alignment.
Figure 14
Column Cap Installation
NOTE:
If the top holes on columns will be used for cable
management, do NOT install column caps to columns
as illustrated below. See Cable Management section
for details.
1.
Use four 5/16-18 x 1/2" button head cap screws (EE) to
install each column cap (N) to each column. (See Figure 15)
Figure 15
Adjustments
Height Adjustment
1.
Use upper knob on back of interface brackets (Y and Z) to
adjust the height of each display. (See Figure 16)
NOTE:
Adjust both brackets in order to maintain a level mount.
Plumb Adjustment
2.
Use middle and lower knobs on back of interface brackets
(Y and Z) to make plumb adjustments to each display. (See
Figure 16)
Figure 16
Cable Management
1.
Route cables from displays through nearest holes on front
of columns and out through back cable management hole.
(See Figure 17)
NOTE:
For best access, route display cables through columns
prior to display installation. See Cable Management
section for details.
Figure 17
(I) x 2
underside view
7
(N)
1
(EE) x 4
1
1
2
2
(display not shown for clarity)
(displays not shown for clarity)
1
1
1
1
Содержание LBM Series
Страница 18: ...LBM Series Installation Instructions 18 Figure 21 FRONT ...
Страница 19: ...Installation Instructions LBM Series 19 ...