3
1
10.2
Automatic lubrication using of the hydraulic breaker of
the CP750, CP1150, CP1650, CP2250, CP3050 and CP4250
10.2.1 Automatic lubrication using CP−Lube
Hydraulic breakers CP750, CP
11
50, CP
16
50,
CP2250, CP3050 and CP4250 are e
q
uipped with
the CP
−L
ube automatic lubrication unit as standard.
CP
−L
ube is attached near the ser
v
ice opening on the
upper part of the breaker bo
x
.
10.2.2 Changing the lubricant cartridge
The diagrams below depict the logical steps in
v
ol
v
ed in preparing and fitting a new cartridge.
H
O
pen the cartridge by taking off the cap and, on
sealed cartridges, by cutting off the seal abo
v
e
the cone (Fig.
1
)
Important:
Do not cut off or damage the cone
itself!
H
Depress the cartridge piston with your thumb until
lubricant emerges from the threaded end (Fig. 2).
H
S
crew the cartridge into the bore pro
v
ided in the
pump unit as far as it will go.
The CP
−L
ube is now ready for operation
(Fig. 3).
Fig.
1
Cone
S
eal
Fig. 2
Fig. 3
M
etering screw
L
ubrication nipple
for emergency
lubrication
10.2.3 Operating the CP−Lube
Please obser
v
e the following information
:
H
CP
−L
ube is selfbleeding, i.e. the system re
q
uires
no additional bleeding.
H
The cartridge is made of transparent, recyclable
plastic (P
E
), so the lubricant le
v
el in the cartridge
can be monitored at all times from the dri
v
er’s cab
by obser
v
ing the position of the piston, which is
red.
H
The piston end of the cartridge must ne
v
er be
sealed off, as this would render deli
v
ery imposs
ible.
H
The amount of lubricant deli
v
ery per stroke can
be set using the metering screw, allowing the unit
to be adapted to differing re
q
uirements.
Turn the screw clockwise
= smaller deli
v
ery
per stroke
Turn the screw anticlockwise = greater deli
v
ery
per stroke
H
O
nce the cartridge is empty, the pump unit must
be sealed off to pre
v
ent water or dust penetration.
Close the unit with a dust cap or simply lea
v
e the
empty cartridge in position until a new cartridge is
a
v
ailable.
H
E
mergency lubrication is possible
v
ia the lu
−
brica
tion nipple on the front of the CP
−L
ube.
S
ee chapter
0.2.2
, Fig. 3.
H
The connections for hoses used to operate the
CP
−L
ube unit must be checked once a week to
ensure they ha
v
e not come loose.