background image

AXXYS

®

 Stairparts 

Fitting Instructions

With the handrail connectors secure, cut the end 
of the handrail vertically with the bottom newel 

post, leaving 20mm protruding at the bottom of the 
handrail. You can now fit the end cap securing with 
two 30mm screws provided. (fig.13).

Baluster Assembly

If you are using our glass panels please see our 

AXXYS

®

 Glass fitting instructions

Please Note;

When assembling the baluster brackets onto a baluster 
tube, remember to slide the baluster bracket covers onto 

the tube first followed by the tube bung and finally the 

baluster bracket, then lie each baluster bracket onto a 
separate piece of wood to ensure that they are both in-line 
with each other.

Tighten the fixing screws prior to sliding the baluster bracket 

cover over the baluster bracket, the baluster assembly is 

now ready to be fixed on the hand/base rails 

(fig. 14).

All holes for fixing the baluster brackets should be 

pre-drilled.  

The bottom baluster should be fixed vertically no more than 

99mm from the narrowest part of the newel post, in the same 

way as the top baluster was previously (fig. 15).

In order to space the remainder of the balusters evenly 
measure the distance in mm between the centre points 

of the 2 balusters already fitted and divide by 148.5.  

Round the answer up to the next whole number and divide 
the whole number back into the original measurement and 
this will give you the exact spacing (if using a intermediate 
newel you will need to add a baluster on either side of the 
intermediate newel as well at the same dimensions of 99mm 

the formula above will stay the same fig. 15).

Example - 2264mm between centre points of balusters divided by 148.5mm = 15.25, rounded up 
to 16, then take the measurement 2264mm divided by 16 = 141.5mm which is the exact spacing 
to the centre of the spindles.

Pre-drill all holes for the baluster brackets after marking their position on the hand rail and 
base rail, using the spacing measurement from the previous step.

Содержание B&Q AXXYS Series

Страница 1: ...ish Freephone 0800 085 3464 AXXYS Stairparts Fitting Instructions Fitting Instructions for AXXYS Stairparts These Fitting Instructions are for use with the AXXYS range with metal balusters within B Q...

Страница 2: ...spindles have also been tested in accordance with BS610 AXXYS is a contemporary range of stair balustrade designed to inspire As a modular system AXXYS provides the flexibility to blend components fr...

Страница 3: ...lie the baserail on top of the tread nosings and push it up against the newel bases mark against the vertical lines of the newel posts and cut achieving a good finish See fig 1 Rest the cut baserail...

Страница 4: ...e making sure to intersect the baserail line Now measure up 175mm from the intersecting point and mark a horizontal line fig 6 Then finally measure the remaining distance to the top of the newel and r...

Страница 5: ...te Newel Base If your staircase is longer than 3 9m measured between inside newel faces then you will require an intermediate newel for added strength This will require an additional newel base to be...

Страница 6: ...top of the spigot Once cut to length insert the newel post making sure the collar meets with the newel base secure using a PU glue fig 9 Repeat this step for the top newel assembly but the newel must...

Страница 7: ...ottom connector Next slide the Bottom connector onto up the handrail line up both the intermediate and the bottom connector into their relevant newels post brackets and drop into place ensure the bolt...

Страница 8: ...the baluster brackets should be pre drilled The bottom baluster should be fixed vertically no more than 99mm from the narrowest part of the newel post in the same way as the top baluster was previous...

Страница 9: ...provided making sure you have lined it up with your landing baserail It is now ready for you to insert the handrail and secure using the two 30mm screws provided fig 16 The handrail can terminate to...

Страница 10: ...You can also rotate it any angle between 90o to 180o to suit a multitude of configurations Now measure the handrail lengths you require from newel to newel including connector and cut to suit Slide b...

Страница 11: ...e your balusters exactly the same way as for the rake The landing balusters should be fixed vertically no more than 99mm from the narrowest part of the newel posts or wall in the same way as the rake...

Отзывы: