386950CE6CD (07—08)
7
OPERATION
WEEKLY MAINTENANCE
(Every 20 hours of operation)
1. Inspect vacuum hoses for holes and loose cuffs.
2. Lubricate metal shaft on recovery tank drain.
MONTHLY MAINTENANCE
(Every 80 hours of operation)
1. Lubricate wheels with water resistant oil.
2. Inspect machine for water leaks and loose
hardware.
3. Open machine and inspect wiring and replace
wiring harness if signs of corrosion or heat.
4. Unscrew clear bowl on incoming water filter and
clean filter screen. Reassumble filter assembly.
STORING MACHINE
1. Before storing machine, be certain to drain and
rinse tank
2. Store machine in a dry area in an upright position.
3. Open recovery tank lid to promote air circulation.
RECOMMENDED STOCK ITEMS
Refer to Parts List section for recommended stock
items. Stock items are clearly identified with a bullet
preceding the part number. See example below.
PART #
DESCRIPTION
QTY.
J-30.
LID, DOME
1
•
J-38GRANITE
TOP,SOL TANK ROTO GRANITE
1
J-39.5GRANITE
HANDLE,WASTE TANK ROTO GRANI
1
J-39GRANITE
WASTE TANK, ROTO GRANITE
1