UN41-0446AM
B
C
D
A
E
F
English language
Use and maintenance
44
INFORMATION CONCERNING REPLACEMENTS
8
Scrapping the work vehicle
Scrapping operations must be handled by specialised
personnel with suitable skills for the job.
The components removed must be sorted according to
the type of materials they contain and in compliance
with the laws in force concerning “waste collection, sort-
ing and disposal”.
Replacing the flexible plate
For this operation, proceed as outlined below.
1) Loosen the wing nut (
A
).
2) Turn the lock lever (
B
).
3) Push the share forwards and turn it so it is facing
downwards.
4) Release the springs (
C
).
5) Unscrew the screws (
D
).
6) Remov
e the flexible plate (
E
).
7) Fit the new flexible plate in position.
8) Tighten the screws (
D
).
9) Hook up the springs (
C
).
10) Make sure the flexible plate is centred (see “Adjust-
ing the flexible plate centring”).
11) Check the position of the flexible plate with respect
to the share (see “Adjusting the flexible plate posi-
tion”).
12) Tighten the screws (
D
).
13) Refit the share in the work position.
14) Make sure that the share is secured in place with the
lock lever (
B
).
15) Tighten the wing nut (
A
).
Information
Check that the Plant Control device (F) is inside the
share.
Содержание TEXDRIVE BEST
Страница 2: ......
Страница 233: ......
Страница 234: ...VIA GUIZZARDI 38 40054 BUDRIO BO ITALY TEL 051 80 02 53 FAX 051 69 20 611 www checchiemagli com info checchiemagli com...