4
Installation
GB
Installation
12
10
230V
35
Boiler installation
- fix the boiler support bracket to the wall and align it
- hang the boiler onto the bracket
- remove the front boiler casing
- if installing with the hydraulic bar Kit (optional): unscrew the two
A screws and remove the fixing bracket 7. Connect valves and hydraulic
bar connections to the boiler
- if installing with a hydraulic Kit for the first installation, provide the connection
- check the seal of both the water and gas connections and get rid of any leaks.
The backflow preventer drain outlet 5, the heating safety valve 1 and the domestic hot water valve 10 must be connected to a waste water
pipe.
37
A
A