8
Product description
GB
Product description
Minimum clearances
In order to allow easy access to the boiler for maintenance
operations, The boiler must be installed in accordance with
the clearances stated below.
A. Central Heating Flow
B. Domestic Hot Water Outlet
C. Gas Inlet
D. Domestic Cold Water Inlet
E. Central Heating Return
Overall Dimensions
ø
125
130
600
324
54
54
124
54
191
474
875
137
100
900
48
300
300
450
20