CW2900 Installation and Operation Manual
52
Appendix 4: Top Surround and Mantel Shelf Heat Shield
Installation (AC01317)
When a heat shield is installed, you can reduce the clearances to the mantle shelf and the
top surround as followed (refer to Section 8.3 Compliance of a Combustible Mantel
Shelf for additional details).
MAXIMUM MANTEL
SHELF DIMENSION (X)
MANTEL SHELF
CLEARANCES (I)
TOP SURROUND
CLEARANCES (H)
8" / 203 mm
12" (305 mm)
11" (279 mm)
Install the heat shield on the faceplate
(assembled with the faceplate extension)
using 3 self-drilling screws included in
the kit. The heat shield should be
pointing upwards.
Once the heat shield is positioned, install
the faceplate on the insert as in
Appendix 3: Faceplate Installation.