
The enclosure is clamped down
between the holding down bar and the
concrete plinth
Page 27
Holding
down bar
Cable
conduits
5.
Align the enclosure and make sure the two
anchor bolts go through the holes on the
holding down bar as shown in Figure 27.
Fitting the boom pole
6.
Use the boom pole retainer piece as a ruler
to mark a straight line on the boom pole.
Two holes with
8.5mm diameter
110mm
35-50mm
35-50mm
Boom
pole
Boom
retainer
Spring
washer
and nuts
Boom
coupler
7.
Mark and drill the 8.5mm holes in the
boom pole according to the
measurements.
8.
Slide the boom pole retainer piece into the
boom pole and push the mounting bolts
through the drilled holes.
9.
While holding the boom pole retainer piece
in position, fit the boom pole onto the
boom coupler.
10. Fit the M8 spring washers and nuts onto
the bolts and tighten.
It is recommended that the Boom Pole
is fitted when the Boom Coupler is in
the vertical (raised) position.
Concrete
plinth
FIGURE 27. CLAMPING THE ENCLOSURE
Anchor
bolt
FIGURE 28. MARKING THE POLE
FIGURE 29. DRILLING HOLES
FIGURE 30. FITTING THE POLE
Содержание SECTOR 3
Страница 1: ...SECTOR installation manual HIGH VOLUME INDUSTRIAL TRAFFIC BARRIER TM...
Страница 67: ...Notes...
Страница 68: ...www centsys com 0 07 A 0012 SECTOR Installation manual...