13. SECTOR installation
The dotted line denotes recommended
dimensions of the concrete foundation
Enclosure positioning
300mm
300mm
500mm
500mm
Check orientation of the door
Concrete plinth/
foundation
1.
Determine correct position for the barrier
to be installed.
Direction of traffic
Access door
Cable
entry
Holding
down
bar
Access
door
110 - 190mm
M12
anchor
bolts
*
7
0
m
m
2
0
0
m
m
*minimum
*minimum
2.
Prepare hole for concrete foundation.
3.
Install cable conduits, making sure that the
conduits exit in cable entry area, leaving
approximately 50mm of conduit protruding
above the concrete plinth.
4.
Concrete in anchor bolts or fit shield
anchor rawl bolts later (size M12 x 70).
SECTOR
barrier
Concrete
foundation
FIGURE 23. CONCRETE FOUNDATION
FIGURE 24. ORIENTATION
FIGURE 25. CONCRETE FOUNDATION
FIGURE 26. ANCHOR BOLTS
Содержание SECTOR 3
Страница 1: ...SECTOR installation manual HIGH VOLUME INDUSTRIAL TRAFFIC BARRIER TM...
Страница 67: ...Notes...
Страница 68: ...www centsys com 0 07 A 0012 SECTOR Installation manual...