8.8 Example 2 with cegard/Lift LX: Bypassed light curtain in floor zone
This example shows another variant, illustrating how the cegard/Lift LX can be integrated in a system. The difference
to Example 1 is that the light curtain is bypassed somewhat earlier. The light curtain is thus overridden 10 cm prior
to the flush position in the case of an elevator with a landing zone of ±10 cm. This variant is recommended, as many
elevator users try to open the door while travelling slowly. This connection does not trigger an emergency stop under the
conditions described, provided the elevator is already within the floor zone.
SAFETY ADVICE
Mains power must also be available during a safety circuit interruption. Internal call signals (Innenrufe) must
also be possible during a safety circuit interruption.
Cross reference: See Chapter 5.3.2 for timing diagram
Auswerteeinschub
cegard/Lift
Inside calls or
Reset button
Door lock signal
i.e. slow relay
Zone switch
Power supply
Latch solenoid
Safety circuit
Inside calls /
Reset button,
Reference potential
To the elevator control
P
N
PE
Überbrückungsverzögerung
Bündigstellung
Sicherheitskreis
Power
Servicetaste
Check 1 Riegel
+ Notstop
Check 2 Sicherheitskreis
Check 1 Sicherheitskreis
Check 2 Riegel
- Notstop
-
-
+
Überbrückungsverzögerung
+ Überbrückungsverzögerung
- Bündigstellung
+ Bündigstellung
+ Option2
- Option1
- Option1
+ Option1
Innen-Ruf Common
Innenruf 1-8
- Riegel_in
+ Riegel_in
Riegel_out
Sicherheitskreis 1
Sicherheitskreis 2
Diagnose
K10
K1
K2
K3
K4
K5
K5
K9
K8
K7
K15
K14
K13
K12
K11
K16
K21
K20
K19
K18
K17
K33
K32
K31
K30
K29
K28
K27
K26
K25
K24
K23
K22
K34
P
N
K40
K42
K41
K43
K44
K45
Snap-rail
Figure 21:
Connection diagram for early override