![Cedar Summit STONEYCREEK CEDAR PLAYHOUSE P280090 Скачать руководство пользователя страница 38](http://html1.mh-extra.com/html/cedar-summit/stoneycreek-cedar-playhouse-p280090/stoneycreek-cedar-playhouse-p280090_installation-and-operating-instructions-manual_2578712038.webp)
Instructional video: http://www.cedarsummitplay.com/install-stoneycreek
38
C:
From outside the assembly tight to (120) Long
Cafe Gable and (121) Gable End place 2 (122) Cafe
Roofs with the angled edges at the top and they form
a peak. Peak should be tight to the peak of the Roof
Assembly. Attach to both (021) Roof Sides with 3 (S2)
#8 x 1-1/2” Wood Screws per board. (fig. 12.2 and
12.3)
D:
Centered at the peak of (122) Cafe Roofs attach
together with 1 Narrow Angle Bracket using 2 (S37) #7
x 5/8” Pan Screws. (fig. 12.2 and 12.3)
Hardware
Wood Parts
2 x
Cafe Roof 5/8 x 3-1/4 x 27-5/8”
122
Fig. 12.2
Fig. 12.3
Outside View
Outside View
Tight
Cafe Wall
Step 12: Cafe Gable Assembly
Part 2
6 x
#8 x 1-1/2” Wood Screw
2 x
#7 x 5/8” Pan Screw
S37
S2
Other Parts
1 x Narrow Angle Bracket
x 3 per board
S37
x 2 per bracket
Narrow Angle
Bracket
centred
122
S2
122
021
021
121
120
Angled edges at the
top to form a peak