![Cedar Summit STONEYCREEK CEDAR PLAYHOUSE P280090 Скачать руководство пользователя страница 31](http://html1.mh-extra.com/html/cedar-summit/stoneycreek-cedar-playhouse-p280090/stoneycreek-cedar-playhouse-p280090_installation-and-operating-instructions-manual_2578712031.webp)
Instructional video: http://www.cedarsummitplay.com/install-stoneycreek
31
Step 8: Attach Dormer Gussets
A:
On the Door Wall place 1 (080) Dormer Gusset tight against the panel on both sides of the Door and centred
under the pilot holes in each (042) Soffit Wide. From the top attach with 1 (S2) #8 x 1-1/2” Wood Screw per gusset
and from the bottom attach with 1 (S3) #8 x 2-1/2” Wood Screw per gusset. The bottom screws to be installed at
an angle. (fig. 8.1 and 8.2)
Wood Parts
2 x
Dormer Gusset 1-1/4 x 4-1/2 x 6-3/8”
080
Fig. 8.1
Door Wall
2 x
#8 x 1-1/2” Wood Screw
2 x
#8 x 2-1/2” Wood Screw
S2
Hardware
Fig. 8.2
Door
042
042
042
S2
042
080
080
Door
pilot hole
pilot hole
S3
S3
S3