Instructional video: http://www.cedarsummitplay.com/install-stoneycreek
17
Step 2: Roof Assembly
Part 4
E:
On the inside of the assembly on (022)
Roof Front find the centre point then on the 4th
siding up from the bottom, measure 1-1/2” up
from bottom of siding and 2” on each side of
the centre line. Pre-drill 2 holes with a 3/16”
drill bit at the measured spots. (fig. 2.8)
F:
On the outside of the assembly place (024)
Dormer Cleat centred over the pre-drilled holes
then from the inside attach with 2 (S6) #12 x 1”
Pan Screws (with 3/16” flat washer). (fig. 2.9,
2.10 and 2.11)
Fig. 2.8
Fig. 2.10
View from Underneath
Wood Parts
Hardware
2 x
#12 x 1” Pan Screw (3/16” flat washer)
S6
1 x
Dormer Cleat 1-1/4 x 3-1/4 x 12-3/4”
024
022
022
1-1/2”
2” 2”
Mark
centre line
Fig. 2.9
022
024
S6
3/16” Flat
Washer
3/16” Flat
Washer
Fig. 2.11