![Cedar Summit STONEYCREEK CEDAR PLAYHOUSE P280090 Скачать руководство пользователя страница 21](http://html1.mh-extra.com/html/cedar-summit/stoneycreek-cedar-playhouse-p280090/stoneycreek-cedar-playhouse-p280090_installation-and-operating-instructions-manual_2578712021.webp)
Instructional video: http://www.cedarsummitplay.com/install-stoneycreek
21
Step 4: Frame Assembly
Part 2
B:
Flush to the inside face of the Side Wall and Cafe Wall place 1 (041) Soffit End centred in each opening and
attach with 6 (S2) #8 x 1-1/2” Wood Screws per board. Notice the holes are towards the inside of the frame. (fig.
4.3)
C:
On the Door Wall and Back Wall, tight to each (041) Soffit End and flush to the inside face of each wall attach
2 (042) Soffit Wides to each wall with 4 (S2) #8 x 1-1/2” Wood Screws per board. Notice the holes are towards the
inside of the frame. (fig. 4.3)
D:
Make sure the assembly is square on all four corners.
Wood Parts
Hardware
2 x
Soffit End 5/8 x 1-1/2 x 41-3/4”
4 x
Soffit Wide 5/8 x 4-1/4 x 25-1/4”
041
042
Fig. 4.3
Notice holes
towards inside
of panel
x 28
Flush
Tight
041
041
Door Wall
Cafe Wall
Side Wall
Back Wall
042
042
042
Do not use these
holes, leave it
until future step
28 x
#8 x 1-1/2” Wood Screw
S2
S2