1 x
3/8 x 4” Hex Bolt
(3/8” flat washer x 2 & 3/8” lock nut)
Step 27: Swing Post Assembly
Part 2
D:
Place (260) Engineered SW Beam on Heavy T-Bracket and attach to fort with 1 (G17) 3/8 x 6” Hex Bolt
(with 2 flat washers, plastic formed washer and lock nut) and 1 (G18) 3/8 x 9” Hex Bolt (with 2 flat washers,
plastic formed washer and lock nut) as shown in fig. 27.6 and 27.7.
E:
Place (260) Engineered SW Beam (end without Wafer Bolt from Step 26) in between Heavy L-Brackets
assembled in Step A making sure holes are lined up then attach Swing Post Assembly to Swing Beam
Assembly using 1 (G20) 3/8 x 4” Hex Bolt (with 2 flat washers and lock nut) through Heavy L-Bracket. (fig.
27.8)
F:
Attach (260) Engineered SW Beam to Heavy G-Bracket with 1 (G17) 3/8 x 6” Hex Bolt (with 2 flat washers,
plastic formed washer and lock nut). (fig. 27.8)
2 x
3/8 x 6” Hex Bolt
(3/8” flat washer x 2, plastic formed washer & 3/8” lock nut)
1 x
3/8 x 9” Hex Bolt
(3/8” flat washer x 2, plastic formed washer & 3/8” lock nut)
G17
Hardware
G18
G20
3/8” Flat Washer
3/8” Lock Nut
Plastic
Formed
Washer
260
Heavy L-Bracket
Fig. 27.6
Fig. 27.7
Fig. 27.8
3/8” Flat
Washer
3/8” Flat
Washer
G18
G17
G20
Plastic
Formed
Washer
3/8” Lock Nut
3/8” Flat
Washer
260
G17
Heavy G-Bracket
Heavy
T-Bracket
97
Содержание F25668
Страница 146: ...NOTES 146 support cedarsummitplay com ...
Страница 147: ...NOTES 147 support cedarsummitplay com ...