Wood Parts
Hardware
Step 44: Rock Wall Assembly
Part 1
1 x
Access Board FSC 1 x 6 x 23-1/2”
5 x
Rock Board A FSC 1 x 6 x 23-1/2”
5 x
Rock Board B FSC 1 x 6 x 23-1/2”
1 x
Access Board FSC 1 x 5 x 23-1/2”
442
441
440
A:
Flush to the top of (410) Floor and flush to the outside edges of each (382) A Frame Post attach (440)
Access Board with 4 (S20) #8 x 1-3/8” Wood Screws. (fig. 44.1)
B:
Tight to the bottom of (440) Access Board and flush to the outside edges of (382) A Frame Posts attach 5
(441) Rock Board A and 5 (442) Rock Board B, placing them as shown in fig. 44.1, this will prevent rocks from
forming a straight line. Secure boards with 4 (S20) #8 x 1-3/8” Wood Screws per board. (fig. 44.1)
C:
Tight to the last (441) Rock Board A and flush to the outside edges of (382) A Frame Posts attach (443)
Access Board with 4 (S20) #8 x 1-3/8” Wood Screws. (fig. 44.1)
Fig. 44.1
Flush
440
443
48 x
#8 x 1-3/8” Wood Screw
410
S20
S20
x 4 per
board
443
382
441
442
Flush
116
Содержание F25668
Страница 146: ...NOTES 146 support cedarsummitplay com ...
Страница 147: ...NOTES 147 support cedarsummitplay com ...