
DOVER WALLS
Step 6: Silicone and nail remaining
beads before erecting each panel.
Screw remaining panels together as per
wall plan, using 3 Tek screws per join
and 4 on the longer gable end panels.
PG 8
DOVER TOP STIFFENER
Step 7: Using 75mm framing nails, nail both
top plate stiffeners into standard wall panels
studs, as shown using 2 nails per stud. Ensure
ends are flush before nailing.
Step 8: Using 30mm clouts nail top cedar
boards to stiffeners (2
-
3 nails per board).
Predrill holes to stop boards from splitting.