
DOVER WALLS
Step 4: Screw the two wall panels together using
75mm tek screws (3 per panel), ensuring Gable
Wall Panels are inside the Back and Front Panels
as per the wall plan.
Step 5: Silicone edge of weatherboards on stand-
ing panels and nail on cedar beads with 5 x bead
nails. (Refer to wall plan for correct beads).
Make sure bead is properly sealed to avoid leaks.
Note: The top of the bead is bevelled to allow for
slope of roof.
Step 3: Unpack panels and identify wall panels
and door positions as per plan on following page.
Select two panels that go either side of a corner
(gable and standard panel) and stand together.
PG 7