
DOVER DECK
-
OPTIONAL
Step 21 :Lay out Deck joists and assemble
sub floor as shown below, nailing sub
floor together with 90mm nails. Place 30
x 45mm packer between sub floor and
shed floor then attach sub floor to shed
floor, with 5 x 100mm tek screws. Check
subfloor is level and diagonals are cor-
rect before nailing 12 lengths of grip
tread to frame using 50mm nails as
shown. You may need to rip last length
of grip tread to suit.
PG 13