background image

4

Cecilware

®

Water Boilers

Installation

Unpacking Instructions

Carefully unpack the machine and inspect immediately
for shipping damage. The packaging may contain
unattached parts. Your machine was shipped in a carton
designed to give it maximum protection in normal
handling. It was thoroughly inspected before leaving
the factory. In case of damage, contact the shipper, not
Grindmaster-Cecilware.

NOTICE:

The person installing this appliance is

responsible for ensuring that electric and water
connections meet the requirements of the national
electric code, national plumbing code, and any local
ordinances.

See 

Rough-in Drawing

for approximate dimensions

and location of water input.

NOTE:

When positioning the unit, leave a minimum 6

inch (15 cm) clearance on the right side of the water
boiler for ease of service.

Water boilers are shipped with the thermostats in the
OFF position. Do not turn the thermostat ON before
filling the water boiler with water.

Mechanical Installation

NOTICE:

Do not turn thermostat on until all

installation instructions have been followed.

1. Inspect unit to see if any damage occurred in

shipment. 

2. Remove the boiler from the packing material. The

four legs, faucets, and vent cap drain are packed
separately with water boiler. 

3. Install legs by tilting boiler on its side and screwing

legs into leg supports until hand tight. 

4. Carefully right unit and install in its permanent

location, being sure to leave at least 6" (15 cm) on
right side of boiler for access to controls. Position
boiler so that the faucet drips into a drip trough or
drain receptacle of some type.

5. Level the boiler by adjusting the bottom pad of the

legs. 

6. Place the vent cap into the recess in the top of the

unit. 

7. Mount the faucet assembly onto the shank.

Water Hook-up 

NOTICE: 

This equipment must be installed in

compliance with applicable Federal, State and/or Local
plumbing codes having jurisdiction. This product requires
an approved backflow prevention water device, such as
a double check valve, to be installed between the
machine and the water supply. Incoming pressure should
be greater than 30 psi and not more than 70 psi.

NOTICE:

Connecting the water boiler to a warm

water supply will speed up heating and recovery times. 
1. The boiler is equipped with a ¼" Flare water inlet

fitting, which is located on the back of the unit.

2. Provide shut-off valve and union in supply line near

boiler.

3. Minimum inlet pressure at boiler should be 30 PSI.
4.  Maximum inlet pressure recommended at 70 PSI.
5.  Copper flex tubing should be used for valve

connections.

6.  Turn on the water supply line and check for leaks.

NOTE:

A filtering system is recommended to remove

odors and inhibit lime and scale build up in the unit.

NOTE:

In areas with extremely hard water, a water

softener must be installed in order to prevent mineral
deposits that will cause malfunctioning of the
equipment.

Electrical Hook-up

NOTICE:

This equipment must be installed in compliance

with applicable Federal, State and/or Local electrical codes
having jurisdiction. Do not use extension cords. Make sure
that the outlet is properly grounded.
1.  Check rating marking on boiler nameplate to be

sure electric lines match voltage, phase, and
amperage requirements of boiler. Select the proper
cord and cord grip for electrical rating of the boiler.

2.  120V water boilers are provided with 120V/15A

grounding plug. Units must have a separate
120V/15A outlet.

3.  208/240V water boilers are provided with a terminal

block inside the control box. 

Field wiring must be

performed by a qualified serviceman.

1 and 3

phase hook-up for units with terminal blocks. To
access terminal block, remove the fastener on the
cover and slide off cover. Install a suitable conduit
and connect copper wires to terminal L1 and L2
(and L3 for 3 phase unit only) and a #14 AWG
ground wire to the ground lug.

WARNING: ELECTRIC SHOCK HAZARD!

Installation of this appliance should be performed by
qualified service personnel only. Improper installation
could result in electrocution.

CAUTION

These urns are heavy pieces of equipment. It is
recommended that moving or lifting the unit be done
by two people to avoid injury.

Содержание CME10E-N

Страница 1: ...9 Wiring Diagram 10 Thank you for purchasing this quality boiler For your safety and the safety of others read all warnings and the operator manual before installing or using the product Properly inst...

Страница 2: ...ock damage unit and will void warranty To reduce risk of explosion or fire do not use near combustibles WARNING Safety Information 2 Cecilware Water Boilers Important Safety Information This is the sa...

Страница 3: ...300 25 5 1 10 AWG 240 10 500 25 3 10 AWG 208 7 900 22 3 10 AWG NOTE 1 FIELD WIRING MUST BE SUITABLE FOR 75 DEGREES CELSIUS 2 USE COPPER WIRE ONLY FOR POWER SUPPLY CONNECTION 3 120 VOLT UNITS SUPPLIED...

Страница 4: ...ce such as a double check valve to be installed between the machine and the water supply Incoming pressure should be greater than 30 psi and not more than 70 psi NOTICE Connecting the water boiler to...

Страница 5: ...nit with a damp cloth using soap solution or a non abrasive compound when required Sanitizing 1 With power to the unit disconnected fill unit to capacity 2 Prepare a sanitizing solution in accordance...

Страница 6: ...stat shaft 2 Using a narrow bladed screwdriver engage slotted adjustment screw and turn it 1 4 turn slowly counter clockwise 3 Allow a few minutes for the temperature to reach set level The Heater Lig...

Страница 7: ...NOT TURN ON THERMOSTAT UNTIL BOILER IS PRIMED Replacing Thermostat Thermostat is located in side box of boiler Lift off side box door to gain access to thermostat then follow instructions below 1 Shut...

Страница 8: ...ll does not flow after the wire is disconnected from the Probe the problem may be in the Solid State Dual Level Control Board 3 If water starts flowing into the tank the Probe may be grounded due to e...

Страница 9: ...Water Boilers Cecilware 9 Parts Diagram...

Страница 10: ...10 Cecilware Water Boilers Wiring Diagram...

Страница 11: ...Water Boilers Cecilware 11 Wiring Diagram continued...

Страница 12: ...12 Cecilware Water Boilers Wiring Diagram continued...

Страница 13: ...tinued 1 PHASE 240 VOLTS G197A 2 x 3 5 KW TOTAL 7 KW 3 PHASE 240 VOLTS G197A 3 x 3 5 KW TOTAL 10 5 KW CONTACTOR CONTACTOR TERMINAL BLOCK L1 L2 N TERMINAL BLOCK L1 L2 L3 N SHEET 4 of 4 ELECTRICAL DIAGR...

Страница 14: ...14 Cecilware Water Boilers...

Страница 15: ...Water Boilers Cecilware 15...

Страница 16: ...lware 4003 Collins Lane Louisville KY 40245 USA Phone 502 425 4776 Toll Free 800 695 4500 Fax 502 425 4664 Web gmcw com Email info gmcw com 2016 Grindmaster Cecilware Printed in USA 0516 Form CW 328 0...

Отзывы: