4
significant hazards to
persons
significant damage to
plant and machinery
faults and interruptions
in the production proc-
ess.
Once the system has been
assembled, connected up and
commissioned, the following
additional operations must be
carried out for normal opera-
tion:
Monitoring and maintain-
ing a record of system
functions
Safety measures during
faults and shutdowns
Carrying out the safety
inspections as required by
statutes and directives
Notes:
You must comply with the
national statutes and direc-
tives governing the con-
struction and control of a
system for main and emer-
gency lighting.
You must comply with the
national statutes and direc-
tives governing inspection
and safety tests (e.g. for
function and duration tests).
2 Safety instructions
U
In accordance with specifi-
cations, the CG-Controller
must be operated in an
undamaged and fault-free
state!
U
When performing tasks on
the emergency lighting sys-
tem, make certain that the
system is disconnected
from electrical power!
Note the various power
supplies for normal and
emergency mode in this
regard.
U
Before placing the device in
service, the emergency
lighting system must be
tested according to the
instructions listed in the
“Installation” section of the
operating instructions!
U
Please note for all tasks on
the device applicable na-
tional safety and accident
prevention requirements and
the following safety instruc-
tions in the operating in-
structions that are identified
by a
!
2.1 Important information
about safety at work
and the safe operation
of an emergency light-
ing system
Warning!
This system is part of the
emergency and main lighting
system and therefore part of
the safety equipment of a
building or company.
Unauthorised and unskilled
work on the equipment can
lead to the failure of the main
and/or emergency lighting
system and hence to