CCI.Command
– Operation
26
4.3.3.1
Show Section geometry
In Section Geometry only those values are displayed that are transferred from the
implement.
To display the Section Geometry, proceed as follows:
1. Press the "Show Section Geometry" button (F12) on the
touchscreen
.
→ The view for the Section Geometry opens:
The position of the sections relative to the implement reference point is shown
schematically in the top left box. In this way it is possible to see at a glance,
whether the sections all lie on a line, or whether different distances have been set
in the direction of travel.
The units currently being used are shown in the top right box.
Содержание CCI 100
Страница 2: ...ISOBUS Terminal CCI 100 200 ISOBUS implement control Operating instructions Reference Firmware v5 ...
Страница 92: ...CCI Cam Visual implement monitoring Operating instructions Reference CCI Cam v5 ...
Страница 118: ...CCI Control Documentation and task management Operating instructions Reference CCI Control v4 ...
Страница 224: ...107 10 Notes ...
Страница 227: ...110 Edit 38 ...
Страница 228: ...CCI TECU Tractor data Operating instructions Reference CCI TECU v6 ...
Страница 246: ...CCI TECU Operation 19 4 3 3 1 Overview This tab shows the settings for speed the power take off and the 3 point hitch ...
Страница 272: ...CCI Command GPS track guiding and section control Operating instructions Reference CCI Command v4 ...
Страница 362: ...91 Mark line Change the position of the marker Move reference track to the left Move reference track to the right ...
Страница 366: ...CCI GPS GPS settings and tractor geometry Operating instructions Reference CCI GPS v2 ...
Страница 388: ...CCI Courier Task data exchange between farm PC and terminal Operating instructions Reference CCI Courier v2 0 ...
Страница 389: ...2 Copyright 2014 Copyright by Competence Center ISOBUS e V Albert Einstein Str 1 D 49076 Osnabrück Version number v2 01 ...