![CBE 465 Скачать руководство пользователя страница 14](http://html.mh-extra.com/html/cbe/465/465_user-manual_2575472014.webp)
14 OF 20
Physical Seal
The most common sealing method is a lead-wire seal. Before applying a wire
seal, move the program jumper to the ‘NO’ position located on the indicator main
board. Refer to Table 4 for program jumper location. Doing this will prevent
access to the setup and calibration modes.
All standard units provide two tamper-proof screws used for sealing the rear
panel to the front of the enclosure. A lead-wire seal can be applied by passing
the lead-wire seal wire through a hole in these two screws, thus preventing the
screws from being removed without breaking the seal. The 460 Series panel
mount versions use a lead-wire seal and one screw.
Table 4: Main Board Jumper Location
Model(s)
Program Jumper Location
460, 465
E4
Содержание 465
Страница 1: ...1 OF 20 465 CONTROLLER User s Guide ...