II - Starting
the CaviBlaster
The preparing steps (Checking and Connections) must be already done before this point.
1.- When using the feed pump, start the feed pump by pulling the feed pump switch
(figure # 18) on the cart handle, to the ON position, when using a supplied water source,
open the valve to supply water to the system.
NOTE
: Make sure the system is primed and that there are no leaks, this is a
positive displacement pump and water must be supplied under pressure.
Failure to feed water may result in damage to the pump.
2.- Hold the end of the high pressure hose away before starting the unit.
3.- Once the system is primed, turn the key (figure # 19) to the right for ignition, let the
unit run for a few minutes to warm up / clean the interior of the high pressure hose, to
avoid particles of dirt going to the gun.
NOTE
: If the unit does not start at first, wait for 10 seconds before trying again.
4.- Once the unit is warm and the hose is clean, turn off the unit and turn off the feed
pump.
5.- Connect the ZT Gun (figure # 21), and submerge it into water, make sure the diver
has the trigger pressed in the ON position before starting the unit again, this will prevent
a pressure chock wave from damaging the pump in the instant that the engine is restarted.
6.- At this point is recommended to apply hearing protection to the operator and people
near the unit prior to starting the engine.
7.- Restart the feed pump again and restart the unit again, let the diver go to the desired
position to work.
8.- Once the diver is ready and in position, move the throttle to the MAX position (figure
# 20) so the diver can start the cleaning process.