SECTION 3:
Connecting to central heating systems - Applies to Standard and Dual Fuel Models.
Attach the feed pipes to the radiator valves using the
compression olives and nut.
Position the escutcheon and pipe cover so that they are in
the desired location. These are push fit.
Fill the radiator and bleed using the bleed valve located under
the upper left joint when looking directly at the rail.
Test the towel rail.
INSTALLATION GUIDE
PHONE: +44 1233 840 840
EMAIL: [email protected]
ADDRESS: CATCHPOLE & RYE, SARACENS DIARY, ASHFORD, KENT, TN27 0SA
WWW.CATCHPOLEANDRYE.COM
©COPYRIGHT 2021 CATCHPOLE & RYE.
ALL RIGHTS RESERVED.
The Original Arched Three Bar Heated Towel Radiator
STANDARD, DUAL FUEL & ELECTRIC MODELS