CATCH Power SOLAR RELAY
–
Installation Manual - Page 17
INSTALLATION
–
Configuration
–
System Overrides
Each System override has the following settings
Override Active:
Valid values are Yes or No.
Any override with active status of No will be
ignored.
Override Type:
This is where you define how
the Solar Relay will function for this override.
Start Time:
When do you want the override
to start
Stop Time:
When do you want the override
to finish.
Override Start and Stop times can overlap.
For example:
Override 1
7am
6pm
Override 2
11am
2pm
In this example override 1 will be used to control the load between 7am and
11am, then Override 2 will be used from 11am
–
2pm, then Override 1 will be
used between 2pm and 6pm.