Installation
REFLECTA/5
Page E5
Mounting & Operations Manual
Compass Foundation, Cut-outs and Drillings
Install compass foundation as shown below. The following openings should be cut before starting to install the
reflection tube and compass binnacle:
1. for the reflection tube
2. for the binnacle fixing bolts
3. for the illumination cables and detector cable
The following drawing shows the location of the cutouts and drillings as well as the mounting elements. The
hole of the illumination cables and detector cable should be furnished with a sleeve (app. 30 mm internal Ø) for
bending protection.
Binnacle column
Cable lead-in protection tube, inner dia.
30 mm
Reflection tube
4x Fixing bolts, included,
12 mm
∅
, 80 mm long
Foundation
Deck
min. 450 mm
130
400
440
75
75
8x45°
Outer binnacle base shape
Hole circle diameter of fixing bolts
8 x fixing bolts for reflection tube (yard supply)
Cut-out of reflection tube, 130 mm diameter
4xFixing bolts for reflection tube (see below)
Cable lead-in tube (30 mm inner dia.)
Alterations / Errors reserved
Cassens & Plath GmbH, Am Lunedeich 131, 27572 Bremerhaven, Germany, Tel. +49 471 483 999 0, Fax +49 471 483 999 10
www.cassens-plath.de