
5
INSTALLATION
6033701-R9 EN
GA0092.eps
Flush hydraulic supply hoses
A
Install hoses using union fittings.
B
Operate auxiliary valves for 30 sec.
C
Remove union fittings.
4
CL2787.eps
CL2786.eps
CL0242.eps
5
Mount attachment on truck carriage
A
Center truck behind the attachment.
B
Tilt forward and raise carriage into position.
C
Engage upper mounting hooks with upper
carriage bar. Make sure a centering tab or
hook tab engages a notch on the carriage bar.
Refer to the illustration below.
D
Lift the clamp 5 cm above pallet.
ITA Class II –
15–17 mm
ITA Class III –
18–20 mm
Truck
Carriage
Engage
Notch
ITA Class II –
8–9 mm
ITA Class III –
10–11 mm
Centering Tabs
Upper Hook Tab
(44G CL3 Only)
External
Sideshifter
A
B