
67
Fig. 75 — Single Enthalpy Curve Boundaries
CHECKOUT
Inspect all wiring connections at the economizer module’s termi-
nals, and verify compliance with the installation wiring diagrams.
For checkout, review the Status of each configured parameter and
perform the Checkout tests.
NOTE: For information about menu navigation and use of the
keypad see Interface Overview on page 57.
Power Up
After the W7220 module is mounted and wired, apply power.
Initial Menu Display
On initial start up, Honeywell displays on the first line and
economizer W7220 on the second line. After a brief pause, the
revision of the software appears on the first line and the second
line will be blank.
Power Loss (Outage or Brownout)
All set points and advanced settings are restored after any pow-
er loss or interruption.
NOTE: All settings are stored in non-volatile flash memory.
Status
Use the Status menu (see Table 26) to check the parameter val-
ues for the various devices and sensors configured.
NOTE: For information about menu navigation and use of the
keypad, see Interface Overview on page 57.
Checkout Tests
Use the Checkout menu (see page 61) to test the damper opera-
tion and any configured outputs. Only items that are config-
ured are shown in the Checkout menu.
NOTE: For information about menu navigation and use of the
keypad, see Interface Overview on page 57.
To perform a Checkout test:
1. Scroll to the desired test in the Checkout menu using the
▲
and
▼
buttons.
2. Press the
(Enter) button to select the item. RUN?
appears.
3. Press the
(Enter) button to start the test. The unit
pauses and then displays IN PROGRESS. When the test is
complete, DONE appears.
4. When all desired parameters have been tested, press the
(Menu Up) button to end the test.
The Checkout tests can all be performed at the time of installa-
tion or at any time during the operation of the system as a test
that the system is operable.
TROUBLESHOOTING
Alarms
The economizer module provides alarm messages that display
on the 2-line LCD.
NOTE: Upon power up, the module waits 60 minutes before
checking for alarms. This allows time for all the configured
devices (e.g. sensors, actuator) to become operational. The
exception is the SAT sensor which will alarm immediately.
If one or more alarms are present and there has been no keypad
activity for at least 5 minutes, the Alarms menu displays and
cycles through the active alarms.
You can also navigate to the Alarms menu at any time.
ECONOMIZING
AVAILABLE
NOT AVAILABLE
ENTHALPY
RA
HUM (%RH)
RA
TEMP
TEMPERATURE
ABSOLUTE HUMIDITY
ES5
ES4
ES3
ES2
ES1
HL
P1
(T,RH)
P2 (T,RH)
SINGLE ENTHALPY
DUAL ENTHALPY
HIGH LIMIT
Table 37 — Single Enthalpy and Dual Enthalpy High Limit Curves
ENTHALPY
CURVE
TEMP. DRY
BULB (F)
TEMP.
DEWPOINT (F)
ENTHALPY
(btu/lb/da)
POINT P1
POINT P2
TEMP. (F)
HUMIDITY
(%RH)
TEMP. (F)
HUMIDITY
(%RH)
ES1
80
60
28.0
80
36.8
66.3
80.1
ES2
75
57
26.0
75
39.6
63.3
80.0
ES3
70
54
24.0
70
42.3
59.7
81.4
ES4
65
51
22.0
65
44.8
55.7
84.2
ES5
60
48
20.0
60
46.9
51.3
88.5
HL
86
66
32.4
86
38.9
72.4
80.3
CAUTION
Failure to follow this caution may result in damage to equip-
ment. Be sure to allow enough time for compressor start-up
and shutdown between checkout tests so that you do not short-
cycle the compressors.
Содержание WeatherMaster Puron 48HC D17
Страница 18: ...18 COOLING CHARGING CHARTS Fig 22 Cooling Charging Chart 15 Ton ...
Страница 19: ...19 Fig 23 Cooling Charging Chart 17 5 Ton ...
Страница 20: ...20 Fig 24 Cooling Charging Chart 20 Ton ...
Страница 21: ...21 Fig 25 Cooling Charging Chart 25 Ton ...
Страница 37: ...37 Fig 48 Unit Control Box IGC Location IGC Board IGC Board Side view Front view ...
Страница 40: ...40 Fig 51 Typical IGC Wiring Diagram ...
Страница 46: ...46 Fig 57 RTU Open Overlay for Economizer Wiring ...
Страница 47: ...47 Fig 58 VFD Overlay for W2770 Controller Wiring ...
Страница 84: ...84 Fig B 48HC D17 D28 Control Diagram 208 230 3 60 460 575 3 60 ...
Страница 85: ...85 Fig C 48HC D17 D28 Power Diagram 208 230 3 60 ...
Страница 86: ...86 Fig D 48HC D17 D28 Power Diagram 460 3 60 ...
Страница 87: ...87 Fig E 48HC D17 D28 Power Diagram 575 3 60 ...
Страница 88: ...88 Fig F 48HC D17 D28 Control Diagram with Humidi MiZer System ...
Страница 89: ...89 Fig G 48HC D17 D28 Power Diagram 208 230 3 60 with Humidi MiZer System ...
Страница 90: ...90 Fig H 48HC D17 D28 Power Diagram 460 3 60 with Humidi MiZer System ...
Страница 91: ...91 Fig I 48HC D17 D28 Power Diagram 575 3 60 with Humidi MiZer System ...
Страница 92: ...92 Fig J PremierLink System Control Wiring Diagram 50HE500891 F ...
Страница 93: ...93 Fig K PremierLink System Control Wiring Diagram with Humidi MiZer System ...
Страница 94: ...94 Fig L RTU OPEN Wiring Diagram ...
Страница 95: ...95 Fig M RTU OPEN Wiring Diagram with Humidi MiZer System ...
Страница 97: ......