
Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations.
Catalog No. 04-53480242-01
Printed in U.S.A.
Form 48HC-17-28-02SM
Pg CL-2
2-2020
Replaces: 48HC-17-28-01SM
© Carrier Corporation 2020
-
- -
- -
-
- -
-
- -
-
- -
-
- -
- -
-
- -
-
- -
-
- -
- -
-
- -
-
- -
-
- -
-
- -
- -
-
- -
-
- -
-
- -
-
- -
- -
-
- -
-
- -
-
- -
- -
-
- -
-
- -
-
- -
-
- -
- -
-
- -
-
- -
-
- -
- -
-
- -
-
- -
-
- -
-
- -
- -
-
- -
-
- -
-
- -
-
- -
- -
-
- -
-
- -
-
- -
- -
-
- -
-
- -
-
- -
-
- -
- -
-
- -
-
- -
-
- -
- -
-
- -
-
- -
-
- -
-
- -
- -
-
--
- -
-
- -
- -
-
- -
-
- -
-
- -
- - -
CUT ALON
G
DOTT
E
D
LINE
CU
T ALONG DOTTED LINE
PRESSURES
Gas Inlet Pressure
_____________IN. WG
Gas Manifold Pressure
STAGE 1
_____________IN. WG
STAGE 2
_____________IN. WG
Refrigerant Suction
CIRCUIT A _____________ PSIG
_____________ °F
CIRCUIT B _____________ PSIG
_____________ °F
Refrigerant Discharge
CIRCUIT A _____________ PSIG
_____________ °F
CIRCUIT B _____________ PSIG
_____________ °F
Verify Refrigerant Charge using Charging Charts (Y/N) _____
Verify that 3-phase fan motor and blower are rotating in the correct direction (Y/N) _____
Verify that 3-phase scroll compressor is rotating in the correction direction (Y/N) _____
GENERAL
Economizer minimum vent and changeover settings to job re
q
uirements (if e
q
uipped) (Y/N) _____
Verify smoke detector unit shutdown by utilizing magnet test (Y/N) _____
IV. HUMIDI-MIZER
®
START-UP
NOTE: Units e
q
uipped with either SystemVu™ or RTU Open controls have Service Test menus or modes that can assist with the
Humidi-MiZer System Start-Up function and provide the means to make the observations listed for this start-up.
STEPS
1. Check CTB for jumper 5, 6, 7 (Jumper 5, 6, 7 must be cut and open) (Y/N) _____
2. Open humidistat contacts (Y/N) _____
3. Start unit In cooling (Close Y1) (Y/N) _____
OBSERVE AND RECORD
A. Suction pressure
_______________ PSIG
B. Discharge pressure
_______________ PSIG
C. Entering air temperature
_______________ ° F
D. Li
q
uid line temperature at outlet or reheat coil
_______________ ° F
E. Confirm correct rotation for compressor (Y/N) _____
F. Check for correct ramp-up of outdoor fan motor as condenser coil warms (Y/N) _____
4. Check unit charge per charging chart (Y/N) _____
(Jumper 32L Motormaster
®
temperature sensor during this check. Remove jumper when complete.)
5. Switch unit to high-latent mode (sub-cooler) by closing humidistat with Y1 closed (Y/N) _____
OBSERVE
A. Reduction in suction pressure (5 to 7 psi expected) (Y/N) _____
B. Discharge pressure unchanged (Y/N) _____
C. Li
q
uid temperature drops to 50°F to 55°F range (Y/N) _____
D. LSV solenoid energized (valve closes) (Y/N) _____
6. Switch unit to dehumid (reheat) by opening Y1 (Y/N) _____
OBSERVE
A. Suction pressure increases to normal cooling level
B. Discharge pressure decreases (35 to 50 psi) (Limited by Motormaster control)
C. Li
q
uid temperature returns to normal cooling level
D. LSV solenoid energized (valve closes)
E. DSV solenoid energized, valve opens
7. With unit in dehumid mode close W1 compressor and outdoor fan stop; LSV and DSV solenoids de-energized
(Y/N) _____
8. Open W1 restore unit to dehumid mode (Y/N) _____
9. Open humidistat input compressor and outdoor fan stop; LSV and DSV solenoids de-energized (Y/N) _____
10. Restore set-points for thermostat and humidistat (Y/N) _____
REPEAT PROCESS FOR 2 COMPRESSOR SYSTEMS.
Содержание WeatherMaster Puron 48HC D17
Страница 18: ...18 COOLING CHARGING CHARTS Fig 22 Cooling Charging Chart 15 Ton ...
Страница 19: ...19 Fig 23 Cooling Charging Chart 17 5 Ton ...
Страница 20: ...20 Fig 24 Cooling Charging Chart 20 Ton ...
Страница 21: ...21 Fig 25 Cooling Charging Chart 25 Ton ...
Страница 37: ...37 Fig 48 Unit Control Box IGC Location IGC Board IGC Board Side view Front view ...
Страница 40: ...40 Fig 51 Typical IGC Wiring Diagram ...
Страница 46: ...46 Fig 57 RTU Open Overlay for Economizer Wiring ...
Страница 47: ...47 Fig 58 VFD Overlay for W2770 Controller Wiring ...
Страница 84: ...84 Fig B 48HC D17 D28 Control Diagram 208 230 3 60 460 575 3 60 ...
Страница 85: ...85 Fig C 48HC D17 D28 Power Diagram 208 230 3 60 ...
Страница 86: ...86 Fig D 48HC D17 D28 Power Diagram 460 3 60 ...
Страница 87: ...87 Fig E 48HC D17 D28 Power Diagram 575 3 60 ...
Страница 88: ...88 Fig F 48HC D17 D28 Control Diagram with Humidi MiZer System ...
Страница 89: ...89 Fig G 48HC D17 D28 Power Diagram 208 230 3 60 with Humidi MiZer System ...
Страница 90: ...90 Fig H 48HC D17 D28 Power Diagram 460 3 60 with Humidi MiZer System ...
Страница 91: ...91 Fig I 48HC D17 D28 Power Diagram 575 3 60 with Humidi MiZer System ...
Страница 92: ...92 Fig J PremierLink System Control Wiring Diagram 50HE500891 F ...
Страница 93: ...93 Fig K PremierLink System Control Wiring Diagram with Humidi MiZer System ...
Страница 94: ...94 Fig L RTU OPEN Wiring Diagram ...
Страница 95: ...95 Fig M RTU OPEN Wiring Diagram with Humidi MiZer System ...
Страница 97: ......