
97
START-UP CHECKLIST
(Remove and Store in Job File)
I. PRELIMINARY INFORMATION
MODEL NO.:
SERIAL NO.:
DATE:
TECHNICIAN:
II. PRE-START-UP (insert checkmark in box as each item is completed)
j
VERIFY THAT JOBSITE VOLTAGE AGREES WITH VOLTAGE LISTED ON RATING PLATE
j
VERIFY THAT ALL PACKAGING MATERIALS HAVE BEEN REMOVED FROM UNIT
j
REMOVE ALL SHIPPING HOLD DOWN BOLTS AND BRACKETS PER INSTALLATION INSTRUCTIONS
j
VERIFY THAT CONDENSATE CONNECTION IS INSTALLED PER INSTALLATION INSTRUCTIONS
j
CHECK REFRIGERANT PIPING FOR INDICATIONS OF LEAKS; INVESTIGATE AND REPAIR IF NECESSARY
j
CHECK ALL ELECTRICAL CONNECTIONS AND TERMINALS FOR TIGHTNESS
j
CHECK THAT RETURN (INDOOR) AIR FILTERS ARE CLEAN AND IN PLACE
j
VERIFY THAT UNIT INSTALLATION IS LEVEL
j
CHECK FAN WHEELS AND PROPELLER FOR LOCATION IN HOUSING/ORIFICE AND SETSCREW
TIGHTNESS
j
CHECK TO ENSURE THAT ELECTRICAL WIRING IS NOT IN CONTACT WITH REFRIGERANT LINES
OR SHARP METAL EDGES
j
CHECK PULLEY ALIGNMENT AND BELT TENSION PER INSTALLATION INSTRUCTIONS
III. START-UP
ELECTRICAL
SUPPLY VOLTAGE
L1-L2
L2-L3
L3-L1
CIRCUIT 1 COMPRESSOR AMPS
L1
L2
L3
CIRCUIT 2 COMPRESSOR AMPS
L1
L2
L3
INDOOR-FAN AMPS
OUTDOOR-FAN AMPS
NO. 1
NO. 2
NO. 3
TEMPERATURES
OUTDOOR-AIR TEMPERATURE
DB
WB
RETURN-AIR TEMPERATURE
DB
WB
COOLING SUPPLY AIR
DB
WB
PRESSURES (Cooling Mode)
REFRIGERANT SUCTION, CIRCUIT 1
PSIG
F
REFRIGERANT SUCTION, CIRCUIT 2
PSIG
F
REFRIGERANT DISCHARGE, CIRCUIT 1
PSIG
F
REFRIGERANT DISCHARGE, CIRCUIT 2
PSIG
F
j
VERIFY THAT 3-PHASE FAN MOTOR AND BLOWER ARE ROTATING IN CORRECT DIRECTION.
j
VERIFY THAT 3-PHASE SCROLL COMPRESSOR IS ROTATING IN THE CORRECT DIRECTION
j
VERIFY REFRIGERANT CHARGE USING CHARGING CHARTS
GENERAL
j
SET ECONOMIZER MINIMUM VENT AND CHANGEOVER SETTINGS TO MATCH JOB REQUIREMENTS
(IF EQUIPPED)
Содержание WeatherMaster 50HCQA04
Страница 16: ...16 C160018 Fig 21 Cooling Charging Charts 50HCQA06 C160019 Fig 22 Cooling Charging Charts 50HCQA07 ...
Страница 17: ...17 C160020 Fig 23 Cooling Charging Charts 50HCQD08 C160021 Fig 24 Cooling Charging Charts 50HCQD09 ...
Страница 38: ...38 C10818 Fig 56 RTU OPEN Control Module ...
Страница 78: ...78 APPENDIX V WIRING DIAGRAMS C150427 Fig 58 50HCQA04 A05 Control Wiring Diagram 575 3 60 ...
Страница 80: ...80 APPENDIX V WIRING DIAGRAMS C160013 Fig 60 50HCQ 06 Control Wiring Diagram 575 3 60 ...
Страница 84: ...84 APPENDIX V WIRING DIAGRAMS C150243 Fig 64 50HCQ 04 05 06 Power Wiring Diagram 208 230 1 60 ...
Страница 85: ...85 APPENDIX V WIRING DIAGRAMS C12347 Fig 65 50HCQ 04 05 06 Power Wiring Diagram 208 230 3 60 ...
Страница 86: ...86 APPENDIX V WIRING DIAGRAMS C12353 Fig 66 50HCQ 04 05 06 Power Wiring Diagram 460 3 60 ...
Страница 87: ...87 APPENDIX V WIRING DIAGRAMS C12354 Fig 67 50HCQ 04 05 06 Power Wiring Diagram 575 3 60 ...
Страница 88: ...88 APPENDIX V WIRING DIAGRAMS C160015 Fig 68 50HCQ 07 Power Wiring Diagram 208 230 3 60 460 3 60 575 3 60 ...
Страница 89: ...89 APPENDIX V WIRING DIAGRAMS C12348 Fig 69 50HCQ 09 Power Wiring Diagram 208 230 3 60 460 3 60 575 3 60 ...
Страница 90: ...90 APPENDIX V WIRING DIAGRAMS C12349 Fig 70 50HCQ 12 Power Wiring Diagram 208 230 3 60 460 3 60 575 3 60 ...
Страница 91: ...91 APPENDIX V WIRING DIAGRAMS C12356 Fig 71 50HCQ 12 Power Wiring Diagram 460 3 60 575 3 60 ...
Страница 92: ...92 APPENDIX V WIRING DIAGRAMS C150432 Fig 72 50HCQ PremierLink Control Diagram ...
Страница 93: ...93 APPENDIX V WIRING DIAGRAMS C12359 Fig 73 50HCQ RTU Open Control Diagram ...