
31
Completing Installation of Return Air Smoke
Sensor
SAMPLE TUBE
SCREWS
FLEXIBLE EXHAUST TUBE
C12049
Fig. 49 -- Return Air Detector Shipping Position
1. Unscrew the two screws holding the Return Air
Sensor detector plate. See Fig. 49. Save the screws.
2. Remove the Return Air Sensor and its detector plate.
3. Rotate the detector plate so the sensor is facing out-
wards and the sampling tube connection is on the bot-
tom. See Fig. 50.
RETURN AIR SENSOR
(Operating Position Shown)
SCREWS (2)
SAMPLE TUBE
CONTROLLER
MODULE
C12050
Fig. 50 -- Return Air Sensor Operating Position
4. Screw the sensor and detector plate into its operating
position using screws from Step 1. Make sure the
sampling tube connection is on the bottom and the ex-
haust tube is on the top. See Fig. 50.
5. Connect the flexible tube on the sampling inlet to the
sampling tube on the base pan.
6. For units with an economizer, the sampling tube is in-
tegrated into the economizer housing but the connec-
tion of the flexible tubing to the sampling tube is the
same.
FIOP Smoke Detector Wiring and Response
All units:
FIOP smoke detector is configured to
automatically shut down all unit operations when smoke
condition is detected. See Fig. 51, Typical Smoke
Detector System Wiring.
Highlight A:
JMP 3 is factory--cut, transferring unit
control to smoke detector.
Highlight B:
Smoke detector NC contact set will open on
smoke alarm condition, de--energizing the ORN
conductor.
Highlight C:
24V power signal via ORN lead is removed
at Smoke Detector input on CTB (Control Terminal
Board); all unit operations cease immediately.
PremierLink Control:
Unit operating functions (fan,
cooling and heating) are terminated as described above. In
addition:
Highlight D:
On smoke alarm condition, the smoke
detector NO Alarm contact will close, supplying 24V
power to GRA conductor.
Highlight E:
GRA lead at Smoke Alarm input on CTB
provides 24V signal to FIOP DDC control.
PremierLink:
This signal is conveyed to PremierLink
FIOPs TB1 at terminal TB1--6 (BLU lead). This signal
initiates the FSD sequence by the PremierLink control.
FSD status is reported to connected CCN network.
RTU--OPEN:
The
24V
signal is
conveyed to
RTU--OPEN’s J1--10 input terminal. This signal initiates
the FSD sequence by the RTU--OPEN control. FSD status
is reported to connected BAS network.
Using Remote Logic:
Five conductors are provided for
field use (see Highlight F in Fig. 51) for additional
annunciation functions.
Additional Application Data —
Refer to Catalog No.
HKRNKA--1XA for discussions on additional control
features of these smoke detectors including multiple unit
coordination. See Fig. 51.
Содержание WeatherMaster 50HCQA04
Страница 16: ...16 C160018 Fig 21 Cooling Charging Charts 50HCQA06 C160019 Fig 22 Cooling Charging Charts 50HCQA07 ...
Страница 17: ...17 C160020 Fig 23 Cooling Charging Charts 50HCQD08 C160021 Fig 24 Cooling Charging Charts 50HCQD09 ...
Страница 38: ...38 C10818 Fig 56 RTU OPEN Control Module ...
Страница 78: ...78 APPENDIX V WIRING DIAGRAMS C150427 Fig 58 50HCQA04 A05 Control Wiring Diagram 575 3 60 ...
Страница 80: ...80 APPENDIX V WIRING DIAGRAMS C160013 Fig 60 50HCQ 06 Control Wiring Diagram 575 3 60 ...
Страница 84: ...84 APPENDIX V WIRING DIAGRAMS C150243 Fig 64 50HCQ 04 05 06 Power Wiring Diagram 208 230 1 60 ...
Страница 85: ...85 APPENDIX V WIRING DIAGRAMS C12347 Fig 65 50HCQ 04 05 06 Power Wiring Diagram 208 230 3 60 ...
Страница 86: ...86 APPENDIX V WIRING DIAGRAMS C12353 Fig 66 50HCQ 04 05 06 Power Wiring Diagram 460 3 60 ...
Страница 87: ...87 APPENDIX V WIRING DIAGRAMS C12354 Fig 67 50HCQ 04 05 06 Power Wiring Diagram 575 3 60 ...
Страница 88: ...88 APPENDIX V WIRING DIAGRAMS C160015 Fig 68 50HCQ 07 Power Wiring Diagram 208 230 3 60 460 3 60 575 3 60 ...
Страница 89: ...89 APPENDIX V WIRING DIAGRAMS C12348 Fig 69 50HCQ 09 Power Wiring Diagram 208 230 3 60 460 3 60 575 3 60 ...
Страница 90: ...90 APPENDIX V WIRING DIAGRAMS C12349 Fig 70 50HCQ 12 Power Wiring Diagram 208 230 3 60 460 3 60 575 3 60 ...
Страница 91: ...91 APPENDIX V WIRING DIAGRAMS C12356 Fig 71 50HCQ 12 Power Wiring Diagram 460 3 60 575 3 60 ...
Страница 92: ...92 APPENDIX V WIRING DIAGRAMS C150432 Fig 72 50HCQ PremierLink Control Diagram ...
Страница 93: ...93 APPENDIX V WIRING DIAGRAMS C12359 Fig 73 50HCQ RTU Open Control Diagram ...