
41
START--UP, PREMIERLINK
ELECTRICAL OPERATION HAZARD
Failure to follow this warning could result in personal
injury or death.
The unit must be electrically grounded in accordance
with local codes and NEC ANSI/NFPA 70 (American
National Standards Institute/National Fire Protection
Association.)
!
WARNING
Use the Carrier Communication Network (CCN) software
to start up and configure the PremierLink controller.
Changes can be made using the ComfortWORKS
r
software, ComfortVIEW
t
software, Network Service
Tool, System Pilot
t
device, or Touch Pilot
t
device. The
System Pilot and Touch Pilot are portable interface
devices that allow the user to change system set--up and
setpoints from a zone sensor or terminal control module.
During start--up, the Carrier software can also be used to
verify communication with PremierLink controller.
SET--UP INSTRUCTIONS
All set--up and set point configurations are factory set
and field--adjustable.
Refer to
PremierLink
t
Installation, Start--Up and
Configuration Instructions .
for specific operating
instructions for the controller. Have a copy of this
manual available at unit start--up.
NOTICE
Perform System Check--Out
1. Check all power and communication connections
ensuring the are properly connected and securely
tightened.
2. At the unit, check fan and system controls for proper
operation.
3. At the unit, check electrical system and connections
of any optional electric reheat coil.
4. Ensure all area around the unit is clear of construction
dirt and debris.
5. Ensure final filters are installed in the unit. Dust and
debris can adversely affect system operation.
6. Verify the PremierLink controls are properly
connected to the CCN bus.
START--UP, RTU--OPEN
SET--UP INSTRUCTIONS
Refer to the following manuals for additional
installation, wiring and troubleshooting information
for the RTU--OPEN Controller.:
“Controls, Start--up,
Operation and Troubleshooting Instructions,” “RTU
Open
Installation
and
Start--up
Guide” and
“RTU--Open Integration Guide”
. Have a copy of these
manuals available at unit start--up.
NOTICE
Содержание WeatherMaster 50HCQA04
Страница 16: ...16 C160018 Fig 21 Cooling Charging Charts 50HCQA06 C160019 Fig 22 Cooling Charging Charts 50HCQA07 ...
Страница 17: ...17 C160020 Fig 23 Cooling Charging Charts 50HCQD08 C160021 Fig 24 Cooling Charging Charts 50HCQD09 ...
Страница 38: ...38 C10818 Fig 56 RTU OPEN Control Module ...
Страница 78: ...78 APPENDIX V WIRING DIAGRAMS C150427 Fig 58 50HCQA04 A05 Control Wiring Diagram 575 3 60 ...
Страница 80: ...80 APPENDIX V WIRING DIAGRAMS C160013 Fig 60 50HCQ 06 Control Wiring Diagram 575 3 60 ...
Страница 84: ...84 APPENDIX V WIRING DIAGRAMS C150243 Fig 64 50HCQ 04 05 06 Power Wiring Diagram 208 230 1 60 ...
Страница 85: ...85 APPENDIX V WIRING DIAGRAMS C12347 Fig 65 50HCQ 04 05 06 Power Wiring Diagram 208 230 3 60 ...
Страница 86: ...86 APPENDIX V WIRING DIAGRAMS C12353 Fig 66 50HCQ 04 05 06 Power Wiring Diagram 460 3 60 ...
Страница 87: ...87 APPENDIX V WIRING DIAGRAMS C12354 Fig 67 50HCQ 04 05 06 Power Wiring Diagram 575 3 60 ...
Страница 88: ...88 APPENDIX V WIRING DIAGRAMS C160015 Fig 68 50HCQ 07 Power Wiring Diagram 208 230 3 60 460 3 60 575 3 60 ...
Страница 89: ...89 APPENDIX V WIRING DIAGRAMS C12348 Fig 69 50HCQ 09 Power Wiring Diagram 208 230 3 60 460 3 60 575 3 60 ...
Страница 90: ...90 APPENDIX V WIRING DIAGRAMS C12349 Fig 70 50HCQ 12 Power Wiring Diagram 208 230 3 60 460 3 60 575 3 60 ...
Страница 91: ...91 APPENDIX V WIRING DIAGRAMS C12356 Fig 71 50HCQ 12 Power Wiring Diagram 460 3 60 575 3 60 ...
Страница 92: ...92 APPENDIX V WIRING DIAGRAMS C150432 Fig 72 50HCQ PremierLink Control Diagram ...
Страница 93: ...93 APPENDIX V WIRING DIAGRAMS C12359 Fig 73 50HCQ RTU Open Control Diagram ...