![Carrier 39T Скачать руководство пользователя страница 95](http://html.mh-extra.com/html/carrier/39t/39t_installation-start-up-and-service-instructions-manual_2562109095.webp)
NOTE: Inlet guide vanes are attached to the fan housing so that the
ball joint in view ‘U’ is in the 12 o’clock position with the vanes at
45 degrees. (For upblast discharge units, the ball joint is at the 9 o’clock
position.)
TOP HORIZONTAL FRONT/REAR
ARRANGEMENT SHOWN
(ASSEMBLED RIGHT HAND)
SIZES 07-26
NOTE: Inlet guide vanes are attached to the fan housing so that the
ball joint in view ‘U’ is in the 12 o’clock position with the vanes at
45 degrees.
TOP HORIZONTAL FRONT/REAR
ARANGEMENT SHOWN
(ASSEMBLED RIGHT HAND)
SIZES 32-61
Fig. 77 — Scroll Assembly — Forward-Curved Fan With IGV
95
Содержание 39T
Страница 43: ...Fig 34 Discharge Fabrication Draw Thru Plenum Fans 43 ...
Страница 49: ...Fig 41 Coil Connections and Lifting Points Fig 42 Steam Coil PIping 49 ...
Страница 78: ...Fig 64 Blow Thru Unit Coil Removal Fig 65 Plan View Typical Coil 78 ...
Страница 81: ...Fig 68 Filter Arrangement 2 in and 4 in Flat 81 ...
Страница 82: ...Fig 68 Filter Arrangement 2 in and 4 in Flat cont 82 ...
Страница 83: ...Fig 69 Filter Arrangement Angle Filters 2 in Only 83 ...
Страница 84: ...Fig 69 Filter Arrangement Angle Filters 2 in Only cont 84 ...
Страница 85: ...Fig 70 Filter Arrangement BCF1 Bag or Cartridge Draw Thru 85 ...
Страница 86: ...Fig 70 Filter Arrangement BCF1 Bag or Cartridge Draw Thru cont 86 ...
Страница 87: ...Fig 71 Filter Arrangement BCF3 Bag or Cartridge Blow Thru 87 ...
Страница 88: ...Fig 71 Filter Arrangement BCF3 Bag or Cartridge Blow Thru cont 88 ...
Страница 92: ...NOTE A frame shown shaded Fig 74 Fan Discharge Positions 92 ...
Страница 102: ......
Страница 103: ......